My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®:M PEA Work Plan <br /> Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> 1 INTRODUCTION <br /> CDIM Engineering, Inc. (CDIM) prepared this Preliminary Endangerment Assessment (PEA) Work Plan <br /> on behalf of Fairgrounds Industrial Park LLC (the Owner) to collect analytical data of known quality in order to <br /> assess impacts of the historic operations at the Martin Metal Finishing, Inc. (MMF) location at 1250 South Wilson <br /> Way in Stockton, California (the Site; see Figure 1) and identify whether additional information, remediation or <br /> mitigation is necessary to achieve Site closure certification from the California Environmental Protection Agency <br /> (CaIEPA) Department of Toxic Substances Control (DTSC). <br /> The work is being performed according to the Standard Voluntary Agreement (SVA) for Martin Metal <br /> Finishing, Inc, 1250 South Wilson Way, Stockton (Site Code: 102475& Docket#: HAS-FY21/22-146)dated June <br /> 6, 2022 (DTSC, 2022). A scoping meeting' was held on June 9, 2022. CDIM then submitted a combined <br /> Preliminary Endangerment Assessment (PEA) (Task 4) and Supplemental Site Investigation [SSI] Work Plan <br /> (Task 5.1). Following the submittal of the PEA and SSI Work Plan dated July 25, 2022, DTSC responded with a <br /> comment Ietter2 requesting the preparation of a PEA Work Plan in lieu of the PEA and SSI Work Plan and providing <br /> other comments. Appendix A includes a responsiveness summary showing how DTSC comments were <br /> incorporated into this PEA Work Plan. <br /> This report is being submitted to DTSC's Site Mitigation and Restoration Program for review and approval <br /> and is intended to satisfy Task 4.1 (PEA Work Plan), Task 17 (Health and Safety Plan), and Task 18 (Quality <br /> Assurance/Quality Control [QA/QC] Plan).3 The SVA applies to the Site and any off-site area to which hazardous <br /> substances have or may have migrated from the Site. <br /> ' Scoping meeting held at 1:30 PM on June 9,2022 between Daniel Ochoa and Joseph Tapia of DTSC and Scott Bourne and <br /> Kylie Cush of CDIM. Site objectives, Site history,the conceptual site model (CSM), and risk assessment were discussed. <br /> 2 Letter from Daniel Ochoa of DTSC to Gary Levin of Fairgrounds Industrial Park. Re: Martin Metal Finishing Inc. (Former): <br /> Preliminary Endangerment Assessment and Supplemental Site Investigation Work Plan. Dated August 26, 2022. <br /> 3 The scope of the QA/QC Plan and Health and Safety Plan is for the investigation activities described herein. It is understood <br /> that updates may be required if additional Site activities such as construction or mitigation are proposed. <br /> CDIM—Fairgrounds Industrial Park Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.