Laserfiche WebLink
CAdmbgL�- �Pp <br /> =014 Quality Assurance/Quality Control Plan <br /> N G I a 1 R I N G Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> 2 PROJECT ORGANIZATION AND RESPONSIBILITIES <br /> Project oversight will be provided by DTSC's Site Mitigation and Restoration Program. Personnel <br /> identified for this project and key responsibilities are listed are discussed below. <br /> The CDIM Project Manager is responsible for acquiring resources necessary to implement this QA/QC <br /> Plan, ensuring the QA/QC Plan is implemented by the project team, and maintaining communications between <br /> CDIM, DTSC, and the Owner throughout the project. The CDIM Project Manager is: <br /> Scott Bourne, PE <br /> CDIM Engineering, Inc. <br /> Phone: (415) 994-1204 <br /> Email: sab(a)cdimengineering.com <br /> The qualified field team is responsible for implementing and ensuring subcontractor compliance with the <br /> QA/QC Plan. The qualified persons conducting the sampling are: <br /> Kylie Cush, PG <br /> CDIM Engineering, Inc. <br /> Phone: 610-301-7742 <br /> Email: kgc(c�cdimengineering.com <br /> John Robertshaw, EIT <br /> CDIM Engineering, Inc. <br /> Phone: 310-780-3136 <br /> Email: jrr(aDcdimengineering.com <br /> The person responsible for arranging site access is: <br /> Bob Morgan <br /> Property Manager, Fairgrounds Industrial Park <br /> (209)462-8538 <br /> Email: bob.morgan.office(Dgmail.com <br /> The California-certified analytical laboratories that may conduct analytical testing are: <br /> Pace Analytical <br /> 1933 Davis Street, Suite 311 <br /> San Leandro, CA 94577 <br /> Phone: 925-334-1908 <br /> Eurofins Caiscience, LLC <br /> 2841 Dow Avenue, Suite 100 <br /> Tustin, CA 92780 <br /> Phone: 714-895-5494 <br /> CDIM—Fairgrounds Industrial Park Page 3 <br />