My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Standard Operating Procedure <br /> Vaporp i ,, Installation and Extraction <br /> of the Vapor Pin® Sampling Device <br /> ■ Updated January 28, 2021 <br /> Scope: • Dead blow hammer; <br /> • VAPOR PIN® sampling device flush mount <br /> This standard operating procedure describes cover, if desired; <br /> the installation and extraction of the VAPOR • VAPOR PIN® sampling device drilling <br /> PIN® sampling device for use in sub-slab soil- guide, if desired; <br /> gas sampling. • VAPOR PIN® sampling device protective <br /> cap; and <br /> Purpose: • VOC-free hole patching material <br /> The purpose of this procedure is to assure (hydraulic cement) and putty knife or <br /> trowel for repairing the hole following the <br /> good quality control in field operations and extraction of the VAPOR P1N® sampling <br /> uniformity between field personnel in the use device. <br /> of the VAPOR PIN® sampling device for the <br /> collection of sub-slab soil-gas samples or <br /> pressure readings. <br /> Equipment Needed: <br /> • Assembled VAPOR PIN® sampling device <br /> [VAPOR PIN® sampling device and <br /> silicone sleeve (Figure 1)l; Because of <br /> sharp edges, gloves are recommended for <br /> sleeve installation; <br /> • Hammer drill; Figure 1. Assembled VAPOR PIN® sampling <br /> • 5/8-inch (16mm) diameter hammer bit device <br /> (hole must be 5/8-inch (16mm) diameter <br /> to ensure seal. It is recommended that Installation Procedure: <br /> you use the drill guide). (HiltiT" TE-YX <br /> 5/8" x 22" (400 mm) #00206514 or 1) Check for buried obstacles (pipes, <br /> equivalent); electrical lines, etc.) prior to proceeding. <br /> • 1 V2-inch (38mm) diameter hammer bit <br /> (HiltiTM TE-YX 11/2" x 23" #00293032 or 2) Set up wet/dry vacuum to collect drill <br /> equivalent) for flush mount applications; cuttings. <br /> • 3/4-inch (19mm) diameter bottle brush; <br /> • Wet/Dry vacuum with HEPA filter 3) If a flush mount installation is required, <br /> (optional); drill a 1 1/2-inch (38mm) diameter hole at <br /> • VAPOR PIN® sampling device least 13/4—inches (45mm) into the slab. <br /> installation/extraction tool; Use of a VAPOR PIN® sampling device <br /> drilling guide is recommended. <br /> VAPOR PIN"sampling device protected under US Patent#8,220,347 R2 and other US and Intemational Patents <br /> Vapor Pin Enterprises, Inc•7750 Corporate Blvd.,Plain City,Ohio 43064•(614)504-6915•https://www.vaporpin.com/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.