My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Operating Procedure <br /> Installation and Removal of the Vapor Pin® Sampling Device <br /> Updated January 28, 2021 <br /> Page 2 <br /> 4) Drill a 5/8-inch (16mm) diameter hole <br /> through the slab and approximately I- <br /> inch (25mm) into the underlying soil to <br /> form a void. Hole must be 5/8-inch <br /> (16mm) in diameter to ensure seal. It is <br /> recommended that you use the drill <br /> guide. <br /> 5) Remove the drill bit, brush the hole with <br /> the bottle brush, and remove the loose <br /> cuttings with the vacuum. <br /> Figure 3. Installed VAPOR PIN® sampling <br /> 6) Place the lower end of VAPOR P1N® device <br /> sampling device assembly into the drilled <br /> hole. Place the small hole located in the 7) For flush mount installations, cover the <br /> handle of the installation/extraction tool vapor pin with a flush mount cover, using <br /> over the vapor pin to protect the barb either the plastic cover or the optional <br /> fitting, and tap the vapor pin into place stainless-steel Secure Cover (Figure 4). <br /> using a dead blow hammer (Figure 2). <br /> Make sure the installation/extraction tool <br /> is aligned parallel to the vapor pin to <br /> avoid damaging the barb fitting. <br /> Figure 4. Secure Cover Installed <br /> Figure 2. Installing the VAPOR PIN® 8) Allow 20 minutes or more (consult <br /> applicable guidance for your situation) <br /> for the sub-slab soil-gas conditions to re- <br /> During installation, the silicone sleeve will equilibrate prior to sampling. <br /> form a slight bulge between the slab and the <br /> VAPOR PIN® sampling device shoulder. Place 9) Remove protective cap and connect <br /> the protective cap on VAPOR PIN® sampling sample tubing to the barb fitting of the <br /> device to prevent vapor loss prior to sampling VAPOR PIN® sampling device. This <br /> (Figure 3). connection can be made using a short <br /> VAPOR PIN®sampling device protected under US Patent#8,220,347 B2 and other US and International Patents <br /> Vapor Pin Enterprises, Inc. • 7750 Corporate Blvd.,Plain City,Ohio 43064•(614)504-6915•https://www.vapoipin.com/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.