My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Operating Procedure <br /> Installation and Removal of the Vapor Pin® Sampling Device <br /> Updated January 28, 2021 <br /> Page 3 <br /> piece of TygonTM tubing to join the Figure 6. Water dam used for leak detection <br /> VAPOR PIN® sampling device with the <br /> Nylaflow tubing (Figure 5). Put the 1 1) Collect sub-slab soil gas sample or <br /> Nylaflow tubing as close to the VAPOR pressure reading. When finished, replace <br /> PIN® sampling device as possible to the protective cap and flush mount cover <br /> minimize contact between soil gas and until the next event. If the sampling is <br /> TygonTM tubing. complete, extract the VAPOR PIN® <br /> sampling device. <br /> Extraction Procedure: <br /> 1) Remove the protective cap, and thread <br /> the installation/extraction tool onto the <br /> barrel of the VAPOR PIN® sampling <br /> device (Figure 7). Turn the tool clockwise <br /> continuously, don't stop turning, the <br /> Figure 5. VAPOR PIN® sampling device VAPOR PIN® sampling device will feed <br /> sample connection into the bottom of the <br /> installation/extraction tool and will <br /> 10) Conduct leak tests in accordance with extract from the hole like a wine cork, DO <br /> applicable guidance. if the method of NOT PULL. <br /> leak testing is not specified, an alternative <br /> can be the use of a water dam and 2) Fill the void with hydraulic cement and <br /> vacuum pump, as described in SOP Leak smooth with a trowel or putty knife. ,- <br /> Testing the VAPOR PIN® sampling device '. <br /> via Mechanical Means (Figure 6). For <br /> flush-mount installations, distilled water <br /> can be poured directly into the 1 1/2 inch <br /> (38mm) hole. <br /> Figure 7. Removing the VAPOR PIN <br /> sampling device <br /> • Prior to reuse, remove the silicone <br /> sleeve and protective cap and discard. <br /> Decontaminate the VAPOR PIN® <br /> VAPOR PIN®sampling device protected under US Patent#8,220,347 B2 and other US and International Patents <br /> Vapor Pin Enterprises, Inc. 7750 Corporate Blvd.,Plain City,Ohio 43064•(614)504-6915•https://www.vapoipin.com/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.