My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SM <br /> •• <br /> ®.. Project Health and Safety Plan <br /> E N 6 1 N E E R I M G Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> Task Team Member Involvement Field Activities to be Performed <br /> Task 4. Sample CDIM • Transport samples to the designated <br /> Transport laboratory. <br /> 3.5 Project Schedule <br /> This HSP applies to all sampling events at the Site. The proposed schedule is approximately two field <br /> days in summer or fall 2022. <br /> 3.6 Local Health Department Guidance Regarding COVID-19 <br /> CDIM and subcontractor staff shall adhere to all orders issued by the San Joaquin County Public Health <br /> Services (SJCPHS) related to COVID-19. These protocols are continuously updated, and this plan may need to <br /> be modified in response. <br /> 4 PROJECT PERSONNEL <br /> All CDIM personnel including contractors and subcontractors, who are working on this project will follow <br /> the health and safety procedures set forth in this HSP.The HSP acknowledgement will be signed by all employees <br /> and all representatives who actively participate in this project. Personnel identified for this project are listed in <br /> Table 3, and the table should be updated in the hard-copy HSP kept onsite, as needed. Key responsibilities and <br /> authorities for each role are discussed in following sections. <br /> Table 3. Key Personnel <br /> Name, Firm Role Phone/ Email <br /> John Robertshaw, CDIM Engineering Field Engineer (310)780-3136 <br /> jrr@cdimengineering.com <br /> Kylie Cush, CDIM Engineering Field Lead, SHSO (610) 301-7742 <br /> kgc@cdimengineering.com <br /> Mary Cunningham, CDIM Engineering Office Support (541)740-5096 <br /> mec@cdimengineering.com <br /> Scott Bourne, CDIM Engineering CDIM Project Manager, Health and (415)994-1204 <br /> Safety Program Manager(HSPM) sab@cdimengineering.com <br /> Bob Morgan, Fairgrounds Industrial Property Manager (209)462-8538 <br /> Park bob.morgan.office@gmail.com <br /> Gary Levin, Martin Metal Finishing Owner garymelvin@gmail.com <br /> Inc. <br /> FIELD STAFF <br /> OFFICE SUPPORT <br /> OWNER OR SITE CONTACT <br /> 4.1 CDIM Project Manager <br /> The project manager shall have the following responsibilities: <br /> • Review status of latest public health orders from the SJCPHS with CDIM employees and <br /> subcontractors during safety briefings and as-needed based on changing conditions; <br /> CDIM—Fairgrounds Industrial Park Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.