My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0548036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:59:14 PM
Creation date
3/12/2026 2:51:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548036
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0027410
FACILITY_NAME
MARTIN METALS FINISHING,INC (FORMER)
STREET_NUMBER
1250
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15512007,15512014,15
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1250 S WILSON WAY STOCKTON 95205
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"" • <br /> .. Project Health and Safety Plan <br /> E N 6 1 N a E R I M G Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> Table 6. Emergency Response Contact Information <br /> Emergency Services <br /> Ambulance 911 <br /> Fire Department 911 <br /> Police 911 <br /> Police, Non-Emergency (209) 937-8377 <br /> Poison Control (800)222-1222 <br /> State Emergency Response System (916) 322-4336 <br /> EPA Emergency Response Team, Region 9 (800) 852-7550 <br /> Nearest Medical Facility <br /> San Joaquin General Hospital 1212 N California Street, Stockton, California 95202 <br /> Phone (209) 835-4934 <br /> Emergency Phone 911 <br /> In the event of an emergency, immediate action must be taken by the first person to recognize the event. <br /> Use the following steps as a guideline: <br /> • Survey the situation to ensure that it is safe for you and the victim. Do not endanger your own life. <br /> Do not enter an area to rescue someone who has been overcome unless properly equipped and <br /> trained. Ensure that all protocols are followed. If applicable, review Material Safety Data Sheets <br /> (MSDS)to evaluate response actions for chemical exposures. <br /> • Call the appropriate emergency number (911, if available) or direct someone else to do this <br /> immediately. Be prepared to explain the physical injury, chemical exposure, fire, or release and <br /> location of the incident. <br /> • Have someone retrieve the nearest first aid kit and Automated External Defibrillator (AED), if <br /> available. Only use an AED if you have been properly trained and are currently certified to do so. <br /> • Administer first aid and cardiopulmonary resuscitation (CPR), if properly trained, until emergency <br /> responders arrive. <br /> • Report incident as described in Section 10 Incident Reporting. <br /> • In the event that evacuation is required,the onsite CDIM project manager or SHSO must perform <br /> a head count to verify that all personnel have been accounted for. <br /> • Personnel qualified and current in basic first aid and/or CPR procedures may perform those <br /> procedures, as necessary. Personnel qualified and current in basic first aid and/or CPR are <br /> protected under Good Samaritan policies as long as they only perform the basic tasks that they <br /> were taught. Do not perform first aid and/or CPR tasks if you have not been trained in first aid <br /> and/or CPR. <br /> 10 INCIDENT REPORTING <br /> Project personnel are required to report injuries, illnesses, accidents, and near-miss incidents that have <br /> the potential for injury or property damage to their immediate supervisor at or immediately following the time of <br /> the incident. Upon receipt of a report, the supervisor shall notify the SHSO. The supervisor and the SHSO will <br /> immediately notify the CDIM project manager and Owner and work together to document the incident and take <br /> appropriate action. <br /> CDIM—Fairgrounds Industrial Park Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.