Laserfiche WebLink
I <br /> COWIM <br /> Project Health and Safety Plan <br /> E N G ,N E E R,N G Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> 7.3 Other Equipment <br /> As-needed equipment for PEA sampling may be required for some project work. Equipment to have <br /> available is not limited to, but includes: <br /> • First aid kit; <br /> • Eye wash bottle (filled); <br /> • Plenty of potable water and soap for rinsing the body should an exposure occur; <br /> • Change of clothes; <br /> • Paper towels for wiping; and <br /> • Garbage bags/zip-lock bags to dispose of gloves and other disposable materials. <br /> 8 TRAINING <br /> All contractors and subcontractors working on the project must be trained on this HSP. Additional training <br /> requirements for specific project personnel are listed below. Completion of site-specific individual worker training <br /> related to project-related health and safety issues is required prior to the start of worker employment on site. <br /> Training documentation shall be saved by each team member for their employees, and it must be provided to the <br /> CDIM project manager within 48 hours upon written request. <br /> Table 5. Training Requirements <br /> Training Staff Type Required <br /> CPR SHSO, SCO <br /> First Aid SHSO, SCO <br /> HSP-1 PPE SHSO, SCO, Field Staff <br /> HSP-2 Respiratory Protection SHSO, SCO, Field Staff <br /> HSP-4 Physical Hazards SHSO, SCO, Field Staff <br /> HSP-6 Infectious Disease Preparedness and Response Plan SHSO, SCO, Field Staff <br /> HSP-10 Heat and Cold Stress SHSO, SCO, Field Staff <br /> HSP-12 Hearing Protection SHSO, SCO, Field Staff <br /> 9 EMERGENCY PROCEDURES <br /> In the event of an emergency, the SHSO or other field staff shall call the appropriate emergency services <br /> as listed in Table 6 below. An emergency evacuation map and a route map to the nearest medical facility are <br /> provided in Appendix D. <br /> CDIM—Fairgrounds Industrial Park Page 13 <br />