Laserfiche WebLink
CBMIUM4 <br /> . CDIM Corporate Health and Safety Program <br /> HSP-10. Heat and Cold Stress Management <br /> Rev. 0 05/21/2020 <br /> E N G I N E E R I N G <br /> Notes: <br /> L/M/H/V/O= Light/Medium/Heavy/Very Heavy/Other <br /> Air=Measured the air temperature using a standard thermometer,with the bulb shielded from radiant heat. <br /> Adj. =Adjusted Air Temperature: Calculate the adjusted air temperature(ta adj)by using this equation: to adj °F=to °F+ (13 x% sunshine). Estimate the percent sunshine <br /> by judging what percent time the sun is not covered by clouds that are thick enough to produce a shadow. Measure the air temperature using a standard thermometer,with <br /> the bulb shielded from radiant heat. 100 percent sunshine= no cloud cover and a sharp, distinct shadow; 0 percent sunshine= no shadows. <br /> Data self-recorded by employee. <br /> End: end of work cycle and beginning of rest cycle <br /> Pi is heart rate at 30 seconds while P3 is heart rate at 3 mins. into rest cycle(and sitting); P1 —P3 is heart recovery over 2.5 minute interval. <br /> U/D/S: U = increase work/rest; D=decreased work/rest; S= Keep work/rest the same. <br /> COMMENTS: <br /> Same day data review: ❑ ok ❑ not ok Comments: <br /> Reviewer Name/Title: <br /> Date: <br /> Note:this record will be treated as confidential and will be shared with those who require the information in order to maintain employee safety <br />