Laserfiche WebLink
IN Environmental Science Engineering <br /> Construction•Development•Industrial•Municipal <br /> cpwdolm <br /> E N G I N E E R i N G 45 Polk Street,3rd Floor•San Francisco,California 94102•415.498.0535•cdimengineering.com <br /> September 26, 2022 <br /> Daniel Ochoa Joseph Tapia <br /> Project Manager Supervising Toxic Substances Engineer <br /> Department of Toxic Substances Control Department of Toxic Substances Control <br /> Site Mitigation and Restoration Program Site Mitigation and Restoration Program <br /> 1515 Tollhouse Road 1515 Tollhouse Road <br /> Clovis, California 93611 Clovis, California 93611 <br /> (sent via e-mail to Daniel.Ochoa@dtsc.ca.gov) (sent via e-mail to Jospeh.Tapia@dtsc.ca.gov) <br /> RE: Preliminary Endangerment Assessment Work Plan, Martin Metals Finishing Inc., 1250 South <br /> Wilson Way, Stockton, California (EnviroStor Site ID 60003373) <br /> Dear Daniel Ochoa and Joseph Tapia: <br /> On behalf of Fairground Industrial Park, LLC,CDIM Engineering herewith submits for CaIEPA Department <br /> of Toxics Substance Control (DTSC)review the enclosed Preliminary Endangerment Assessment Work Plan.The <br /> document was prepared in accordance with the June 6, 2022 Standard Voluntary Agreement (SVA) for Martin <br /> Metal Finishing, Inc, 1250 South Wilson Way, Stockton (Site Code: 102475 & Docket#: HAS-FY21/22-146) and <br /> the August 26, 2022 DTSC comment letter'. <br /> Please do not hesitate to contact me (office: 415-498-0535, mobile: 415-994-1204; or, email: <br /> sabCa�cdimengineering.com)with any questions or comments. <br /> Sincerely, <br /> CDIM Engineering, Inc. <br /> Scott Bourne, PE C27817 <br /> Principal Engineer <br /> cc: Gary Levin, Fairgrounds Industrial Park(sent via e-mail to garymlevin@gmail.com) <br /> Kylie Cush, CDIM (sent via e-mail to kgc@cdimengineering.com) <br /> ' Letter from Daniel Ochoa of DTSC to Gary Levin of Fairgrounds Industrial Park. Re: Martin Metal Finishing Inc. (Former): <br /> Preliminary Endangerment Assessment and Supplemental Site Investigation Work Plan. Dated August 26, 2022. <br />