Laserfiche WebLink
PEA Work Plan <br /> R G I a 1 R I H G Martin Metals Finishing Inc. (Former) <br /> Stockton, California <br /> an "ON HOLD PENDING ANALYSIS" note. CDIM will collect one waste characterization sample and submit for <br /> laboratory analysis. The drum will be temporarily stored onsite pending laboratory analysis, then disposed of at <br /> an appropriate facility in accordance with applicable laws and regulations. <br /> CDIM—Fairgrounds Industrial Park Page 16 <br />