Laserfiche WebLink
CONFIDENTIAL <br /> PROJECT LOCATION <br /> THIS DRAWING IS THE PROPERTY <br /> 2 <br /> -- OF MISSION CLEAN ENERGY. NO <br /> Tr .. REPRODUCTION MAY BE MADE IN WHOLE <br /> OR IN PART WITHOUT WRITTEN <br /> _ .---fir <br /> CONSENT <br /> ,.� <br /> PRELIMINARY <br /> NOT FOR CONSTRUCTION <br /> ml <br /> �J r <br /> i <br /> �^ r <br /> VICINITY MAP <br /> \� E <br /> I u L L0 <br /> % \ \ z � m <br /> PROJECT SUMMARYLL <br /> ° iu z , <br /> _ �`' / TOTAL PROJECT AREA (ACRES) 42.5 w .o <br /> a os <br /> TECHNOLOGY ENERGY STORAGE w O <br /> , POINT OF INTERCONNECTION KASSON 115KV SUBSTATION <br /> _ � <br /> ° INTERCONNECTION VOLTAGE (KV) 115 � <br /> cn <br /> GEN-TIE DISTANCE (FEET) 3000 N <br /> TYP.) _ BESS CAPACITY (MW) 250 C) <br /> u <br /> STRUCTURE 2: PROPOSED 20 X 8 ENERGY STORAGE CONTAINER ( � I I _- <br /> BESS CAPACITY (MWh) 1000 c' <br /> BESS ENCLOSURE MODEL SUNGROW ST5015kWh-1250kW-4h-US <br /> BESS ENCLOSURE CAPACITY (MWh) 5.015 <br /> EXISTING WATER CHANNEL (TYP.) <br /> PROJECT BOUNDARY 960' �/ + � PROJECT SUBSTATION AREA (SQ. FT.) 22500 n/ <br /> / / LLu <br /> / °`� <br /> / 7 <br /> W <br /> WR,� BUILDINGS AND STRUCTURES <br /> °O oo�oo�o0 0 0 <br /> °� STRUCTURE �/ <br /> 1632' �/� NUMBER (AS NUMBER OF SQUARE TOTAL BUILDING L.L_ O <br /> PROPOSED USES UNITS FOOTAGE SQUARE HEIGHT OCCUPANCY <br /> SHOWN ON <br /> G PER UNIT FOOTAGE w U <br /> SITE PLAN) <br /> ° O&M EQUIPMENT <br /> 1 STORAGE TRAILER 2 200 400 10 N/A W <br /> PROPOSED 150'X 150' PROJECT 115KV SUBSTATION 2 ENERGY STORAGE 360 160 57600 10 N/A 0 <br /> CONTAINER <br /> SS,O� � Q <br /> O <br /> oy I/ <br /> \ , W <br /> STRUCTURE 1: PROPOSED 20' X 10' O&M EQUIPMENT STORAGE TRAILER (D Q <br /> LEGEND u) <br /> ui <br /> � . . � . . � <br /> PROJECT BOUNDARY N <br /> PROPERTY LINE <br /> / O <br /> EXISTING KASSON 115KV SUBSTATION / 50' PROPERTY SETBACK <br /> °\\ <br /> / <br /> x x 6' TALL SECURITY FENCE WITH 1' TALL BARBED WIRE <br /> PROPOSED 24' WiDE GRAVEL FACILITY ACCESS ROAD <br /> / O/H O/H EXISTING OVERHEAD ELECTRICAL LINE <br /> °\\ - A <br /> / 'MR <br /> °O- 3 <br /> / RAILROAD TRACKS 0 <br /> APPROVED BY: AQ <br /> O <br /> EXISTING WETLAND CHECKED BY: <br /> \ <br /> °s NORTH <br /> DESIGNED BY:DRAWN BY: BK <br /> / PROPOSED STORMWATER BASIN <br /> °\� PROJECT NUMBER: <br /> / <br /> /°" PROPOSED CONSTRUCTION LAYDOWN AREA DRAWING NAME: <br /> ° <br /> s <br /> s SITE PLAN <br /> N <br /> °s NOTES: <br /> L \ <br /> N s 1. NO PERMANENT PARKING FACILITIES WILL BE REQUIRED. <br /> N \ 2. NO STRUCTURES ARE PROPOSED FOR REMOVAL. SCALE: <br /> 3. NO EXISTING OR PROPOSED PRIVATE WATER WELLS WILL BE REQUIRED. vv <br /> 0 5 4. NO EXISTING OR PROPOSED WASTEWATER TREATMENT SYSTEMS WILL BE REQUIRED. 1 — 500v <br /> z 5. SUBJECT PARCEL IS FLAT.�J,J NOTE:IF LINE#1",DRAWING NOT TO SCALE <br /> coy 6. NO LANDSCAPING WILL BE REQUIRED. DRAWING No. REVISION <br /> o 7. NO TREE REMOVAL WILL BE REQUIRED. <br /> > Z 8. SIGNAGE: ALL SIGNAGE TO CONFORM TO 9-1705 & 9-1710 COUNTY REGULATIONS. SIGNAGE TO CONSIST OF <br /> cn PLACARDS FOR SAFETY PURPOSES AND CONFORM TO NEC STANDARDS AS APPLICABLE. spi 01 1 <br /> i s <br /> Q <br /> J <br /> C:\USERS\BEN\MISSION CLEAN ENERGY DROPBOX\PROJECT DEVELOPMENT\01 PROJECTS\CAISO\ZEITGEIST K ENERGY CENTER (BESS)\05 ENGINEERING & EPC\01 DESIGN & PRODUCTION\02 10% SITE PLAN\ZEITGEIST—SITE PLAN-10.29.25\ZEITGEIST—SITE PLAN-10.29.25.DWG <br />