Laserfiche WebLink
CONFIDENTIAL <br /> THIS DRAWING IS THE PROPERTY <br /> OF MISSION CLEAN ENERGY. NO <br /> REPRODUCTION MAY BE MADE IN WHOLE <br /> OR IN PART WITHOUT WRITTEN <br /> 0 0 CONSENT. <br /> MAIN POWER DEAD END <br /> TRANSFORMER 34.5kV / 230kV EL 75'-0" FROM <br /> EL 25'-0" FROM TOP OF GRADE TOP OF GRADE PRELIMINARY <br /> LIGHTNING MAST NOT FOR CONSTRUCTION <br /> EL 55-0" FROM TOP OF GRADE <br /> BREAKER <br /> EL 9'-6" FROM <br /> SWITCHGEAR TOP OF GRADE <br /> SUBSTATION CONTROL EL 23'-2" FROM <br /> m m m m m m m 9.5' ENCLOSURE EL 13'-0" TOP OF GRADE <br /> FROM TOP OF GRADE SWITCHES <br /> � o <br /> rn <br /> o Q <br /> o o <br /> U <br /> 0 E <br /> 0 <br /> I u L <br /> U ti co <br /> 20' z Q � <br /> � N � <br /> TYPICAL SUBSTATION STRUCTURES AND ELEVATIONS u Q <br /> co 2 <br /> 0 <br /> Front View w0 .E w <br /> TYPICAL BESS CONTAINER STRUCTURE AND ELEVATION I u N <br /> N <br /> mmiM <br /> u <br /> `L <br /> 1 <br /> Z C <br /> L .. <br /> C <br /> 10.5' @ 2 = 21 ' 1 ' 20' 1 ' 7' z <br /> GATE V <br /> 10' 10' �y O <br /> 13 ' L C <br /> 20' MIN. Z z <br /> � Z <br /> W L <br /> ON L V <br /> o 0 0 o Q <br /> N 0- <br /> ACCESS ROAD (f� <br /> N L 0 0 0 0 0 0 0 0 o 0 0 (n Z <br /> X <br /> LU �^ <br /> ° v! <br /> COARSE AGGREGATE L <br /> (MUST EXTEND FULL WIDTH N <br /> OF INGRESS AND EGRESS OPERATION <br /> FINISHED GRADE <br /> Hl EL.+0.000 <br /> ° o <br /> Lw <br /> WIPEmMESHAGALVANI50 <br /> Dmm TYPICAL SITE ACCESS DRIVEWAY DIMENSION ° <br /> 0 <br /> 0 <br /> APPROVED BY: AQ <br /> CHECKED BY: <br /> DESIGNED BY: <br /> DRAWN BY: BK <br /> TYPICAL BESS AREA FENCE DETAIL PROJECT NUMBER: <br /> DRAWING NAME: <br /> LD EQUIPMENT ELEVATIONS AND DETAILS <br /> LO NOTES: <br /> N <br /> O <br /> N <br /> N 1. EQUIPMENT DRAWINGS ARE NOT TO SCALE SCALE: <br /> 2. EQUIPMENT VENDORS ARE NOT FINALIZED AND EXACT DIMENSIONS ARE <br /> o SUBJECT TO CHANGE WITH FINAL EQUIPMENT SELECTION. DRAWINGS ARE NTS <br /> w REPRESENTATIVE OF TYPICAL EQUIPMENT SIZING AND CONFIGURATIONS NOTE IF LINE#,",DRAWING NOT TO SCALE <br /> } 3. ALL SITE ACCESS DRIVES TO BE CONSTRUCTED PER CALTRANS GUIDANCE DRAWING No. REVISION <br /> 0 4. SITE PLAN IS CONCEPTUAL IN NATURE AND EQUIPMENT LOCATIONS ARE <br /> ui <br /> > SUBJECT TO CHANGE WITH DETAILED ENGINEERING. <br /> cn SP102 1 <br /> I— <br /> cn <br /> Q <br /> J <br /> C:\USERS\BEN\MISSION CLEAN ENERGY DROPBOX\PROJECT DEVELOPMENT\01 PROJECTS\CAISO\ZEITGEIST K ENERGY CENTER (BESS)\05 ENGINEERING & EPC\01 DESIGN & PRODUCTION\02 10% SITE PLAN\ZEITGEIST_SITE PLAN_10.29.25\ZEITGEIST_SITE PLAN_10.29.25.DWG <br />