Laserfiche WebLink
Exceedances of concentration limits are addressed by the ongoing Corrective Action Program that includes a landfill <br /> gas extraction system,a groundwater extraction and treatment system,and ongoing monitoring. Under the existing <br /> Corrective Action Program, the groundwater treatment system pumped approximately 53.8 million gallons of <br /> groundwater during first quarter 2026, removing approximately 0.82 pounds of VOCs. <br /> Proposed Additions to the MRP <br /> The following locations are not currently part of the MRP and will need to be incorporated in the next revision of the <br /> MRP: <br /> • Two pan lysimeters and sumps (pan lysimeters TS-1 and TS-2 and sumps TS-1 and TS-2) associated with <br /> WMU FU-23 are shown on Figure 4 of the enclosed report.Sumps TS-1(FU-23)and TS-2(FU-23)were added <br /> to the quarterly monitoring program in fourth quarter 2024 and pan lysimeters TS-1 (FU-23) and TS-2(FU- <br /> 23) were added to the quarterly monitoring program in second quarter 2025. These locations should be <br /> added to Tables 6 and 25 of the MRP in the next revision. <br /> • Two pan lysimeters and sumps (pan lysimeters TS-3 and TS-4 and sumps TS-3 and TS-4) associated with <br /> WMU FU-24 are shown on Figure 4 of the enclosed report.Sumps TS-3(FU-24)and TS-4(FU-24)were added <br /> to the quarterly monitoring program in fourth quarter 2024 and pan lysimeters TS-3 (FU-24) and TS-4(FU- <br /> 24) were added to the quarterly monitoring program in second quarter 2025. These locations should be <br /> added to Tables 6 and 25 of the MRP in the next revision. <br /> • Four additional groundwater extraction wells CDCR-EW-2 through CDCR-EW-S,as shown on Figure 6 of the <br /> enclosed report,were installed on the CDCR property after the issuance of the MRP.These locations were <br /> added to the quarterly monitoring program beginning in second quarter 2025 and should be included in <br /> Table 19 of the MRP in the next revision. <br /> • Pan lysimeters FU-19E and FU-19W were added to the quarterly monitoring program in second quarter <br /> 2025 and the locations should be included in Table 6 of the MRP in the next revision. <br /> Certification Statement <br /> I certify under penalty of law that I have personally examined and am familiar with the information submitted in this <br /> document and all attachments, and that based on my inquiry of those individuals immediately responsible for <br /> obtaining this information, I believe that the information is true,accurate,and complete. I am aware that there are <br /> significant penalties for submitting false information, including the possibility of fine and imprisonment. If you have <br /> questions or comments regarding the above information, please contact me at(209)601-2274. <br /> Kindest regards, <br /> Osvaldo Cordero <br /> Environmental Manager <br /> 2 <br />