My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 2/11/26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD 2/11/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 10:17:41 AM
Creation date
3/24/2026 4:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 2/11/26
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />North County Recycling Center & Sanitary Landfill Department of Public Works/Solid Waste <br />First Semiannual 2025 Groundwater Monitoring Report ©2025 COUNTY of San Joaquin. All Rights Reserved <br /> 5 <br />A DMP Evaluation Report was submitted to the Regional Board on November 15, 2021 and <br />provided evaluation of the monitoring network for data gaps and effectiveness, evaluation of <br />historical changes in groundwater flow direction beneath the landfill, and three (3) proposed <br />monitoring well locations to fill gaps in the monitoring network and provide a point of compliance <br />well for Module 5. Regional Board’s review and conditional approval was provided on <br />December 13, 2021. The three monitoring wells (G-12, G-13, and G-14) were installed per the <br />approved work plan in June 2022. Due to pump procurement and supply chain delays, pumps <br />were not received and installed until June 2023. Five-Year COC sampling was completed in late <br />June 2023 and a Well Installation Report with the details of the drilling, installation, development, <br />and groundwater sampling was submitted on August 23, 2023.
The URL can be used to link to this page
Your browser does not support the video tag.