Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Unit Total <br />Item Description Units Price Quantity Cost <br />1 MOBILIZATION/DEMOBILIZATION <br />Components: Equipment transport, permits, construction trailer setup, project management, and <br />administration. <br />Heavy Equipment Transport ea 3,800.00$ 5 19,000.00$ <br />Office Trailer ls 5,000.00$ 1 5,000.00$ <br />Utilities monthly 350.00$ 0.5 175.00$ <br />Bonding %2%1 1,770.00$ <br />Project Management and Administration hr 224.00$ 16 3,584.00$ <br />Engineering Technician hr 153.00$ 16 2,448.00$ <br />Administrative Assistance hr 117.00$ 8 936.00$ <br />Subtotal - Mobilization/Demobilization 32,913.00$ <br />2 SUBGRADE PREPARATION <br />Components: Preparing bench subgrade for reconstruction. Includes excavation of any debris, <br />rough grading, and compaction as necessary to provide a stable surface. <br />Grade Staking Surveying ls 5,000.00$ 1 5,000.00$ <br />Backhoe w/ Operator hr 213.16$ 8 1,705.28$ <br />Dozer w/ Operator hr 424.52$ 8 3,396.16$ <br />Water Truck w/ Operator hr 217.92$ 8 1,743.36$ <br /> Compactor w/ Operator hr 356.16$ 8 2,849.28$ <br /> Motor Grader w/ Operator hr 331.80$ 8 2,654.40$ <br />Grade Checker hr 134.29$ 8 1,074.32$ <br />Subtotal - Subgrade Preparation 18,422.80$ <br />TABLE D-1 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />PRECIPITATION IMPACTS <br />1 of 5