Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Unit Total <br />Item Description Units Price Quantity Cost <br />3 BENCH AND PERIMETER CHANNEL RECONSTRUCTION <br />Components: Surveying and setting grade stakes for the reconstruction of the bench and perimeter <br />channels, excavate and haul ~170 cubic yards from borrow/stockpile area, mixing, moisture <br />conditioning, placing, and spreading soil in areas needed to return to design grades. Assumes <br />soil can be obtained from on-site borrow/stockpile area. <br />Grade Staking Surveying ls 5,000.00$ 1 5,000.00$ <br />Scraper w/ Operator hr 444.99$ 2 889.98$ <br />Dozer w/ Operator hr 424.52$ 16 6,792.32$ <br />Water Truck w/ Operator hr 217.92$ 16 3,486.72$ <br />Steel Drum Roller w/ Operator hr 235.58$ 16 3,769.28$ <br /> Motor Grader w/ Operator hr 331.80$ 16 5,308.80$ <br />Grade Checker hr 134.29$ 16 2,148.64$ <br />Field CQA (20% of Construction Costs)hr 20%1 5,479.15$ <br />Subtotal - Bench and Top-Deck Berm Channel Reconstruction 32,874.89$ <br />4 EROSION CONTROL <br />Components: Hydroseeding of surface with native plant species. <br />Seeding of Final Surface with Native Plant Species acre 3,100.00$ 0.5 1,550.00$ <br />Foreman hr 140.62$ 8 1,124.96$ <br />Laborers hr 97.07$ 16 1,553.12$ <br />Subtotal - Erosion Control 4,228.08$ <br />TABLE D-1 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />PRECIPITATION IMPACTS <br />2 of 5