Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Unit Total <br />Item Description Units Price Quantity Cost <br />1 MOBILIZATION/DEMOBILIZATION <br />Components: Equipment transport, permits, construction trailer setup, project management, and <br />administration. <br />Heavy Equipment Transport ea 3,800.00$ 4 15,200.00$ <br />Office Trailer ls 5,000.00$ 1 5,000.00$ <br />Utilities monthly 350.00$ 1 350.00$ <br />Drill Rig ea 6,300.00$ 1 6,300.00$ <br />Bonding %2%1 2,078.00$ <br />Project Management and Administration hr 224.00$ 24 5,376.00$ <br />Engineering Technician hr 153.00$ 24 3,672.00$ <br />Administrative Assistance hr 117.00$ 16 1,872.00$ <br />Subtotal - Mobilization/Demobilization 39,848.00$ <br />2 EXCAVATION <br />Components: Excavation and temporary stockpile of waste. <br />Assumes excavation area of 50-feet diameter and 10-feet deep. <br />Dozer w/ Operator hr 424.52$ 8 3,396.16$ <br />Scraper w/ Operator hr 444.99$ 8 3,559.92$ <br />Water Truck w/ Operator hr 217.92$ 8 1,743.36$ <br />Subtotal - Excavation 8,699.44$ <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />1 of 6