Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Unit Total <br />Item Description Units Price Quantity Cost <br />3 FIRE SUPPRESSION <br />Components: Excavation, hauling and placement of ~730 cubic yards of soil for fire suppression. <br />Assumes an area of 50-feet diameter at 2-foot thick. Assumes soil will obtained from onsite <br />borrow area/stockpile. <br />Scraper w/ Operator hr 444.99$ 4 1,779.96$ <br />Dozer w/ Operator hr 424.52$ 4 1,698.08$ <br />Water Truck w/ Operator hr 217.92$ 4 871.68$ <br /> Padfoot Compactor w/ Operator hr 356.16$ 4 1,424.64$ <br /> Motor Grader w/ Operator hr 331.80$ 4 1,327.20$ <br />Grade Checker hr 134.29$ 4 537.16$ <br />Subtotal - Fire Suppression 7,638.72$ <br />4 REPLACE WASTE AND FINAL COVER <br />Components: Haul and placement of removed waste. Surveying and setting grade stakes for the <br />final cover, excavate and haul ~1,460 cubic yards from borrow/stockpile area, mixing, placing, <br />spreading, moisture condition, and track-walking 4-foot thick final cover (2 foot foundation layer, <br />1 foot low permeability layer, and 1 foot vegetative soil layer). Assumes soil will be obtained from <br />onsite borrow area/stockpile. <br />Grade Staking Surveying ls 5,000.00$ 1 5,000.00$ <br />Scraper w/ Operator hr 444.99$ 8 3,559.92$ <br />Dozer w/ Operator hr 424.52$ 8 3,396.16$ <br />Water Truck w/ Operator hr 217.92$ 8 1,743.36$ <br /> Padfoot Compactor w/ Operator hr 356.16$ 8 2,849.28$ <br /> Motor Grader w/ Operator hr 331.80$ 8 2,654.40$ <br />Grade Checker hr 134.29$ 8 1,074.32$ <br />Field CQA (20% of Construction Costs)hr 20%1 4,055.49$ <br />Subtotal - Replace Waste and Final Cover 24,332.93$ <br />SUBSURFACE FIRE IMPACTS <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />2 of 6