Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Unit Total <br />Item Description Units Price Quantity Cost <br />5 LANDFILL GAS CONTROL <br />Components: Installation of vertical landfill gas extraction well. Assumes 1 landfill gas well will <br />need to be reconstructed. <br />Drill and Install Landfill Gas Extraction Well lf 108.00$ 100 10,800.00$ <br />Wellhead Assembly ea 1,300.00$ 1 1,300.00$ <br />4-inch SDR 17 HDPE Collection Lateral lf 23.00$ 200 4,600.00$ <br />Field CQA (20% of Construction Costs)%20%1 3,340.00$ <br />Subtotal - Landfill Gas Control 20,040.00$ <br />6 EROSION CONTROL <br />Components: Hydroseeding of surface with native plant species. <br />Seeding of Final Surface with Native Plant Species acre 3,100.00$ 0.2 620.00$ <br />Foreman hr 140.62$ 8 1,124.96$ <br />Laborers hr 97.07$ 16 1,553.12$ <br />Subtotal - Erosion Layer 3,298.08$ <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />SUBSURFACE FIRE IMPACTS <br />3 of 6