Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Item Description <br />1 MOBILIZATION/DEMOBILIZATION <br />2 EXCAVATION <br />3 FIRE SUPPRESSION <br />4 REPLACE WASTE AND FINAL COVER <br />5 LANDFILL GAS CONTROL <br />6 EROSION CONTROL <br />7 CONTRACTOR PER DIEM (INCLUDES TRAVEL)1 <br />8 CONTRACTOR PROFIT AND OVERHEAD (15%)2 <br />9 LANDFILL GAS EXTRACTION WELL INSTALLATION REPORT <br />SUBTOTAL <br />TOTAL NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />Notes: <br />1 Per diem of $206 per 8 hour shift, based on GSA rates for Lodi, California. <br />2 Based on 15% of total Contractor construction work costs. <br />15,578.58$ <br />14,828.00$ <br />138,795.74$ <br />CONTINGENCY @20%27,759.15$ <br />166,554.89$ <br />SUBSURFACE FIRE IMPACTS <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />4,532.00$ <br />Total <br />Cost <br />39,848.00$ <br />8,699.44$ <br />7,638.72$ <br />24,332.93$ <br />20,040.00$ <br />3,298.08$ <br />5 of 6