Laserfiche WebLink
North County Recycling Center and Sanitary Landfill <br />Non-Water Release Corrective Action Plan <br />October, 2024 <br />Consulting Engineer's Rates Rates, $/Hr <br />Principal 270.00$ <br />Project Manager/Senior Engineer 224.00$ <br />Design/Project Engineer 184.00$ <br />CQA Engineer 224.00$ <br />CQA Monitor 132.00$ <br />Geologist/Hydrogeologist 184.00$ <br />Field Technician 153.00$ <br />AutoCAD Technician 153.00$ <br />Clerical 117.00$ <br />Labor and Equipment Rates Used for Construction 1 <br />Equipment Labor Total <br />Laborer -97.07$ 97.07 <br />Grade Checker -134.29$ 134.29 <br />Foreman -140.62$ 140.62 <br />CAT D8L Dozer 288.24$ 136.28$ 424.52 <br />CAT D4H Dozer 77.13$ 134.29$ 211.42 <br />CAT 623F Scraper 308.71$ 136.28$ 444.99 <br />CAT 936E Wheel Loader 126.03$ 136.28$ 262.31 <br />CAT 815 Padfoot Compactor 219.88$ 136.28$ 356.16 <br />CAT 14H Motor Grader 195.52$ 136.28$ 331.80 <br />John Deere JD 410D Backhoe 78.87$ 134.29$ 213.16 <br />3 Axle Water Truck 108.24$ 109.68$ 217.92 <br />CAT 433B Steel Drum Roller 99.30$ 136.28$ 235.58 <br />Watson 2000 Auger (Driller)224.68$ 134.29$ 358.97 <br />5 Axle Belly Dump Truck 136.09$ 110.19$ 246.28 <br />Note: <br /> 1 Labor: General Prevailing Wages Determination by the Director of Industrial Relations, State of California, August 22, 2024, Northern California. <br /> Equipment: State of California Department of Transportation (Caltrans) Labor Surcharge and Equipment Rental Rates, Effective April 1, 2024 to March 31, 2025. <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON-WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />Rates, $/Hr <br />6 of 6