Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />7. SINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) <br />D 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />Yes' <br />. No ' <br />NA <br />Has the testing apparatus been properly calibrated? <br />� <br />❑ <br />❑ <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected? <br />❑ <br />� <br />� <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected? <br />� <br />❑ <br />� <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected? <br />❑ <br />❑ <br />� <br />For electronic LLDs, does the turbine automatically shuf off if any portion of the <br />monitorin s stem is disabled or disconnected? <br />❑ <br />❑ <br />� <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitorin s stem malfunctions or fails a ti htness test? <br />� <br />❑ <br />� <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks? <br />❑ <br />❑ <br />0 <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />� <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />� <br />❑ <br />❑ <br />LLD ID <br />LLD Model <br />Lines Monitored <br />Pass <br />Fail <br />87 Oct <br />F E -.STP -MLD <br />87 PRODUCT LINE <br />0 <br />� <br />91 Oct <br />VMI - 99 LD 2000 <br />91 PRODUCT LINE <br />0 <br />❑ <br />❑ <br />O <br />Describe all answers marked "No" or "Fail" and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Page 4 of 6 <br />