My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 11:15:25 AM
Creation date
4/3/2026 11:12:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231059
PE
2361 - UST FACILITY
FACILITY_ID
FA0002512
FACILITY_NAME
EXPRESS FUEL & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
701 E DR MARTIN LUTHER KING JR BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />8. 'IN -TANK GAUGING TESTING <br />EI Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if NO tank gauging equipment is installed. <br />Do not complete this section if either box is checked. <br />Yes <br />No <br />NA <br />All wiring has been: 1) visually inspected for kinks, breaks and proper entry and <br />termination; and 2 tested for ground faults? <br />❑ <br />❑ <br />❑ <br />Were all in -tank gauging probes visually inspected for damage and residue buildup <br />to ensure that floats move freely, functionally tested, and confirmed operational? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />❑ <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />❑ <br />❑ <br />Probe ID <br />Probe Model <br />Tanks Monitored <br />Pass <br />Fail <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />9. 'COMMENTS <br />Describe all answers marked "No" or "Fail" and proposed remedy. <br />List all monitoring equipment either replaced or repaired. <br />UPON ARRIVAL DISPENSER 1/2 OUT OF SERVICE, FOUND OUT WIRING HAS GONE BAD <br />FROM ELITE IV CONTRACTORS. THIS SITE IS CURRENTLY IN FLUX WITH REPAIRS. THIS <br />SENSOR WILL NOT BE TESTED BY ME TODAY, ELITE IV WILL COMPLETE M C AFTER WIRING <br />REPAIR. ALL OTHER TESTING HAS BEEN PERFORMED ON SITE TODAY. <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.