Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10 . MONITORING SITE PLAN <br /> Date site plan was prepared: 6/4/2024 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: 701 E. CHARTER WAY <br /> C STORE KEY <br /> A=ANNULAR Sensor <br /> . . . . . F=FILLS <br /> . . . . . . . . . . . . . . . . V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> L=Turbine/Leak Detector <br /> . . . . . . . . . \=SUNIP SENSOR <br /> N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S =Brine Sensor <br /> S=Smart Sensor <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C=Floats& Chains <br /> . . . . . . . . . . . . . . . . . . . . . . E=E Stop <br /> . . . . . . . . . . . . .6 . . . . . . . . . . . . . . . . <br /> . . . . . . . . . x . . . . . . . . . . . . . ` . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C <br /> . . . . . . . . . . . . . . . . . . . . H <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T <br /> .3. 4. 7 .8 E <br /> � . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R <br /> . . . . . . . . . . . . . . . <br /> TLS . <br /> JSU <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . W <br /> .QQ .VENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *PIPING* A <br /> . . . . . . . . I . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) Y <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawing of piping <br /> . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . exit of sump and <br /> UDC's. No <br /> 87 91 underground <br /> drawing is accurate, <br /> X x we cannot <br /> A P O (Do <br /> O TL speculate blue <br /> . . . . . TL V F P prints. <br /> f3 ,)e ICIXitt Tla 1 G1'J,� 'tii[1tRf ::^).ir/ nprK lttl�Atl}f'EL r'tT Ut? <br /> �® <br /> 01,rIC•:.:i'e <br /> Date map was drawn:06/16/21. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it, rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />