My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2200 - Hazardous Waste Program
>
PR0514502
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2026 4:29:55 PM
Creation date
4/4/2026 3:52:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0514502
PE
2247 - RCRA GEN 5<25 TONS
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
Stockton
Zip
95203
APN
16103002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3515 Navy DR Stockton 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 Monthly Inspection Checklist <br /> ection Information: �0/S/ Z(P (36 months from inspection date) <br /> General Insp � Retain Until Date: <br /> [Tanks <br /> spection Date: <br /> C i Inspector Name: , <br /> In <br /> Date: J �� <br /> Inspected(ID#'s): <br /> Inspection Guidance: schedulesection does not require a Certified <br /> dition and its containment structure.This visual <br /> i p oblems. .Before <br /> Standard,follow the manufacturer recomn ended inspection/testing and proce ure . <br /> changes an <br /> ➢ For equipment not included in this t Promptly or take other corrective action <br /> ➢ The periodic AST Inspection is intended for monspec orhwho is familiar with the site and can identify <br /> an owner's ino containment area, interstice,or spill container,remove P <br /> Inspector. If shall be performed by tank,secondary disposed of it properly. <br /> ➢ upon discovery of water in the primary problem. a Certified Inspector,or a tank <br /> to the environment, inspect the liquida status,This indi pates that action is required to add ess a p <br /> discharge ineer experienced in AST design, <br /> ➢ (*)designates an item in a non or <br /> components items im crtant to tank or containment rote ri require evaluation by an engine <br /> Lion of critical comp <br /> ➢ Non-conforming on.Note the non-conformance and corresponding corrective action in the comment section. <br /> or maintenance(such as painting)that could affect the oiler accessible after the event. <br /> manufacturer whle will ted checklists for 36 months ac is safely <br /> ➢ Retain the comp components is required as soon as the equipment <br /> nd emergency vents,valves),an inspection of these comp Comments <br /> ➢ In the event of severe weather(snow,ice,wind storms <br /> (normal a <br /> Status <br /> Item <br /> Task <br /> 1.0 Tank Containment * ❑ No �I/A <br /> 1.1 Containment Check for water, <br /> debris, cracks or fire ®Yes <br /> structure hazard <br /> ]Yes* No <br /> 1.2 Primary tank Check for water NIA <br /> 1.3 Containment Operable and in a Dye . ❑ No* <br /> drain valves closed position <br /> 1.4 Pathways and Clear and es ❑ No* ❑ N/A <br /> entry gates/doors <br /> operable <br /> 2.0 Leak Detection Visible signs of Dyes* No <br /> 2.1 Tank leakage <br /> 2.2 Secondary Visible signs of <br /> Containment <br /> leakage from tank ❑Yes* No <br /> into secondary <br /> containment <br /> 2.3 Surrounding soil Visible signs of ❑yes <br /> * No ❑ N/ <br /> leaka e N/A <br /> 2.4 Interstice Visible signs of Dyes* ❑ No SEPTEMBER20'I'I <br /> leakage <br /> AST INSPECTION STANDARD <br />
The URL can be used to link to this page
Your browser does not support the video tag.