Laserfiche WebLink
General Inspection Information: Q - �- <br /> r <br /> 2 D <br /> Inspection Date: 4f 3—_Z7 ON <br /> Retain Until Date: t (�—S-ZG (36 months from inspeuuu,, \ <br /> Prior Inspection Date: 11— 1,G —7_7� Inspector Name: V �� <br /> st: Tanks Inspected(ID#'s): <br /> nE <br /> U; Inspection Guidance: <br /> i ➢ For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> S ➢ The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified <br /> Inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> N ➢ Upon discovery of water in the primary tank,secondary containment area, interstice, or spill container, remove promptly or take other corrective action.Before <br />( discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> ➢ (*)designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> ➢ Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design,a Certified Inspector,or a tank <br /> r manufacturer who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> ➢ Retain the completed checklists for 36 months. <br /> I ➢ In the event of severe weather(snow, ice,wind storms) or maintenance (such as painting)that could affect the operation of critical components <br /> i (normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely accessible after the event. <br /> Item Task Status Comments <br /> 1.0 Tank Containment <br /> 1.1 Containment Check for water, <br /> structure debris, cracks or fire ®Yes* ❑ No *N/A <br /> hazard <br /> 1.2 Primary tank Check for water ❑Yes* t&_Nc <br /> 1.3 Containment Operable and in a Yes El No* 1/A <br /> drain valves closed position <br /> 1.4 Pathways and Clear and Yes [I No* El N/A <br /> entry gates/doors <br /> operable <br /> 2.0 Leak Detection <br /> 2.1 Tank Visible signs of ❑Yes* '�No <br /> leakage <br /> 2.2 Secondary Visible signs of <br /> Containment leakage from tank ❑Yes* No <br /> into secondary <br /> containment <br /> 2.3 Surrounding soil Visible signs of ❑Yes* §Q No ❑ N/A <br /> -leakage <br /> 2.4 Interstice Visible signs of ❑Yes* No ❑ N/A <br /> leakage <br /> SEPTEMEER <br /> AST INSPECTION STANDARD <br /> •1 <br />