My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601188_SSCR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLARKSDALE
>
4915
>
2600 - Land Use Program
>
SU-2601188_SSCR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 2:47:48 PM
Creation date
4/10/2026 2:21:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCR
RECORD_ID
SU-2601188
PE
2603 - SURFACE AND SUBSURFACE CONTAMINATION REPORT REVIEW
STREET_NUMBER
4915
Direction
E
STREET_NAME
CLARKSDALE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01709059
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4915 E CLARKSDALE RD ACAMPO 95220
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUE Program Standards Compendium Volume 3 <br /> Restricted Materials and Permitting <br /> Guidance for 1,3-D Enforcement, Continued <br /> If setbacks or If the setbacks for two or more applications overlap,under 3 CCR section <br /> 1,3-D buffer 6448(c) the setback for both application blocks is based on the combined <br /> zones"overlap" acreage,the highest application rate, and the fumigation method with the <br /> largest setback. See example below on how to calculate the setback. <br /> DPR developed the 1,3-D buffer zones required under 3 CCR section 6448(d) <br /> to account for multiple applications. Thus, if the buffer zone for two or more <br /> applications overlap no additional mitigation is necessary at this time. <br /> Approved 3 CCR section 6448.1 requires DPR to maintain a"List of Approved Totally <br /> tarpaulins Impermeable Film(TIF)Tarpaulins"on its website. The List is available at <br /> <httt)s•//www cdpr ca gov/environmental-monitoring/air-monitoring/>. Click <br /> on,or scroll to,"1,3-Dichloropropene Field Fumigation Requirements"and <br /> click on the Approved Tarpaulin List. <br /> Soil moisture 3 CCR section 6448.2(b)specifies that an application block must have a soil <br /> requirements moisture of at least 50 percent of field capacity at a depth of three to nine <br /> inches below the surface when the fumigation occurs,except for drip <br /> applications. "1,3-Dichloropropene Field Fumigation Requirements,est. <br /> January 1,2026,"provides three options to check soil moisture requirements. <br /> Option 1 (Irrigation)is the easiest to implement but should only be used for <br /> very dry soils. Option 2 (Feel and Appearance)is most similar to the current <br /> label soil moisture method but has some subjectivity associated with <br /> determining soil moisture level based on an evaluation of soil texture. Option <br /> 3 (Soil Moisture Sensor)is more accurate than Option 1 and Option 2,but it <br /> is the most complex, expensive,and time consuming. <br /> The CAC has discretion to require the use of a specific soil moisture option <br /> based on local conditions. <br /> CACs can consult with their DPR Regional Office for soil moisture training <br /> information and availability of a soil moisture sensor specified by Option 3. <br /> The CAC should consider requiring recordkeeping for soil moisture as part of <br /> permit conditions until the U.S. Environmental Protection Agency finalizes <br /> the draft label changes for 1,3-D products that require fumigation <br /> management plans(FMPs), including recordkeeping for soil moisture. <br /> Continued on next page <br /> J-9 <br /> Appendix J—1,3-Dichloropropene(Field Soil Fumigation) <br /> Recommended Permit Conditions and Enforcement Guidance(10-07-2025) <br />
The URL can be used to link to this page
Your browser does not support the video tag.