Laserfiche WebLink
PUE Program Standards Compendium Volume 3 <br /> Restricted Materials and Permitting <br /> Guidance for 1,3-D Enforcement, Continued <br /> Field 3 CCR section 6448.2(d)specifies that 1,3-D fumigations must be made using <br /> Fumigation only the methods specified in"1,3-Dichloropropene Field Fumigation <br /> Methods Requirements, rev. January 1,2026,"and it specifies several new methods <br /> with new field fumigation method(FFM)codes. Methods not specified are no <br /> longer allowed(FFM code 1290). <br /> Notice of intent In addition to the information required in 3 CCR section 6434, the following <br /> (NO]) information should be included on the NOI to aid in documenting the <br /> applicable buffer zone requirements: <br /> 1. The crop to be planted following the fumigation. <br /> 2. Whether a buffer zone is required by the"1,3-Dichloropropene Field <br /> Fumigation Requirements,rev. January 1, 2026" document, <br /> incorporated by reference into 3 CCR section 6448(d). <br /> 1,3-D use 3 CCR section 6626(g)(1)requires 1,3-D use reports to be submitted <br /> reporting electronically in a manner specified by the Commissioner. Commissioners <br /> should specify to submit use-reports through Telus. <br /> Example The following is an example for determining setbacks for overlapping <br /> setbacks for applications as specified in 3 CCR section 6448(c). <br /> overlapping <br /> applications Field 1 Application Block: Fumigation method 1206 (Table 1,Field <br /> Fumigation Requirements document), untarped, 18-inch injection <br /> — 10 acres <br /> — 3001bs./ac application rate <br /> — Fumigation starts on October 31 at 7:00 am and ends at 11:00 am <br /> — 200 ft setback(Table 3a) <br /> Field 2 Application Block: Fumigation method 1224 (Table 1,Field <br /> Fumigation Requirements document), untarped, 24-inch injection <br /> - 5 acres <br /> - 332 lbs./ac application rate <br /> - Fumigation starts on November 2, 8:00 am <br /> - 100 ft setback (Table 5b, Field Fumigation Requirements document) <br /> The applications for Blocks 1 and 2 overlap if they are separated by 300 ft <br /> (200 ft+ 100 ft) or less AND the fumigation for Block 2 starts on November <br /> 1 at 11:00 pm(October 31, 11:00 am+36 hrs.)or earlier. <br /> Continued on next page <br /> J-10 <br /> Appendix J—1,3-Dichloropropene(Field Soil Fumigation) <br /> Recommended Permit Conditions and Enforcement Guidance(10-07-2025) <br />