Laserfiche WebLink
Groundwater Sampling Using a Bailer SOP <br /> be collected in the following order: <br /> • Volatile organic compounds <br /> • Semi-volatile organic compounds (SVOCs) and polyaromatic hydrocarbons <br /> (PAHs) <br /> • Inorganic constituents (metals) <br /> • Mercury <br /> • Cyanide <br /> • Total organic carbon(TOC) <br /> • Total organic halogen (TOX) <br /> • Samples requiring field filtration <br /> • Samples for field parameter measurement <br /> • Samples for nutrient anion determinations <br /> 12. Filter and preserve samples as required by the sampling plan. <br /> 13. Tightly cap the pre-labeled sample container and place it in a pre-chilled cooler, <br /> being careful not to overtighten and breaking the glass container. <br /> 14. Label all samples and log all samples on the Groundwater Purge/Sampling Form - <br /> Purge in accordance with Fieldwork Documentation SOP. Complete a Chain-of- <br /> Custody record in accordance with Completing Chain of Custody SOP. <br /> 15. Dispose purge water in accordance with applicable regulations <br /> 16. Package samples and complete necessary paperwork in accordance with Sample <br /> Packaging and Shipping SOP. <br /> 17. Transport samples to decontamination zone in preparation for transport to <br /> analytical laboratory or to express shipping location. <br /> 18. Dispose disposable bailer in according with the sampling plan and <br /> applicable regulations. <br /> 8.0 Data and Records Management: <br /> To finalize fieldwork documentation in accordance with Antea Group's document control and <br /> retention policies: <br /> • Recheck all data inputs to prevent errors. <br /> • If data were generated from multiple/different sample locations (borings, wells, etc.) at <br /> the same site,use appropriate file naming conventions to distinguish one file from <br /> another(e.g., year month day-what, 20200408_MW-01_MW-15). <br /> • Ensure that any repair work needed, issues to be resolved, and/or any uncompleted <br /> fieldwork are noted in the fieldwork documentation and reported to the PM. <br /> • During the field effort, send photos of field forms to the PM for review at the end of each <br /> day(ultimately at the discretion of the PM). <br /> • Scan and upload copies of field notes/forms and all health and safety documents <br /> (completed JSA and HASP) to the designated project folder in Sharepoint in Teams (e.g., <br /> "Field Notes and Data/Boring Logs")within 48-72 hours after project completion, unless <br /> instructed differently by the PM. <br /> 9.0 Quality Control: <br /> • All data, observations, calculations must be documented in the field logbook, field forms, <br /> and/or any electronic data recording devices (field computers, digital cameras, etc.). <br /> Control#:AG-10034-00 Page 7 of 9 <br /> File Name:Groundwater Sampling Using a Bailer SOP <br />