Laserfiche WebLink
Groundwater Sampling Using a Bailer SOP <br /> • Traceability must be ensured between any field notes and complementary field forms. <br /> This includes site name, author, date, and work task identifier(i.e., MW-4, Tank 02, <br /> Discharge point E1, etc.). This means referencing all other media used in field logbooks, <br /> using dates and page numbers linking forms together, or uploading all documents to the <br /> same destination. <br /> • Any electronic data recording devices must be operated in accordance with <br /> manufacturer's operating instructions, unless documented otherwise. <br /> • Monitoring and Measuring Equipment must be calibrated prior to the event and <br /> calibration results documented in accordance with Equipment Calibration and <br /> Maintenance SOP. <br /> 10.0 References: <br /> • Monitoring Well Installation and Completion SOP <br /> • Groundwater Sampling for PFAS SOP <br /> • Decontamination SOP <br /> • Fieldwork Documentation SOP <br /> • VOC Sample Collection SOP <br /> • Sample Packaging and Shipping SOP <br /> • QA/QC Sample Collection SOP <br /> • Groundwater Purge/Sampling Form - Purge (Attachment 1) <br /> • Water and Liquid Level Measurement SOP <br /> • Measurement of Monitoring Well Field Parameters SOP <br /> • Purging a Monitoring Well with a Bailer SOP <br /> • Purging a Monitoring Well with a Pump SOP <br /> • Sample Labeling SOP <br /> • Fieldwork Documentation SOP <br /> • Completing Chain of Custody SOP <br /> • Sample Packaging and Shipping SOP <br /> • Equipment Calibration and Maintenance SOP <br /> Control#:AG-10034-00 Page 8 of 9 <br /> File Name:Groundwater Sampling Using a Bailer SOP <br />