My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GUILD
>
715
>
2231-2238 – Tiered Permitting Program
>
PR0526078
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 3:08:11 PM
Creation date
4/29/2026 9:25:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0526078
PE
2232 - HAZARDOUS WASTE CA FACILITY
FACILITY_ID
FA0016140
FACILITY_NAME
LUSTRE-CAL LLC
STREET_NUMBER
715
Direction
S
STREET_NAME
GUILD
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04931024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
715 S GUILD AVE LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Standard Procedure <br /> Page 3 <br /> approximately 5 gallons of additional water. This results in a total discharge of— 75 <br /> gallons each time the tank is changed. The operator responsible for discharging the <br /> rinse solution must take care to routinely monitor the T5 pH controller outside to <br /> verify that the final pH discharge is between 6 toll and then record the discharge on <br /> the Etch Hazardous Taste Log. <br /> 3.2.6. Etch Solution -- spent etch solution is manually discharged into the U1 T1 process <br /> waste water collection tank via a floor drain located near the south east corner of the <br /> Etch room. When the solution is no longer effective, the drain valve is partially <br /> opened draining the solution slowly into the On-Site treatment system for eventual <br /> pH adjustment. The tank is then washed and drained again with approximately 5 <br /> gallons of additional water. This results in a total discharge of 75 gallons each <br /> time the tank is changed. The operator responsible for discharging the etch solution <br /> must take care to routinely monitor the T5 pH controller outside to verify that the final <br /> pH discharge is between 6-11 and then record the discharge on the Etch <br /> Hazardous Waste Log. <br /> 3.2.7. Chemco 33S Solution — spent Chemco solution is manually discharged into the U1 <br /> T1 process waste water collection tank via a floor drain located near the south east <br /> corner of the Etch room. The drain valve is partially opened draining the solution <br /> slowly into the On-Site treatment system for eventual pH adjustment. The tank is <br /> then washed and drained again with approximately 5 gallons of additional water. <br /> This results in a total discharge of — 75 gallons each time the tank is changed. The <br /> operator responsible for discharging the rinse solution must take care to routinely <br /> monitor the T5 pH controller outside to verify that the final pH discharge is between 6 <br /> toll and then record the discharge on the Etch Hazardous Waste Log. <br /> 3.2.8. Easisolv Screen Wash — spent screen wash is discharged into the U1 T2 process <br /> waste water collection tank via a wash basin drain located in the screen preparation <br /> area. Screen wash is gradually discharged into the On-Site treatment system for <br /> eventual pH adjustment as screens are cleaned. The amount of discharge various <br /> depending upon the dirtiness of the screen and the discharge is recorded when the <br /> operator refills the 24oz squirt bottle. The operator responsible records the <br /> discharge on the Screen Clean Hazardous Waste Log. <br /> 3.2.5. Anodal Cleaner Solution — spent Anodal Cleaner mild alkaline cleaning solution <br /> (ph w 10.0) is discharged into the U1 T1 process waste water collection tank via <br /> drain located in the coil anodizing line. The cleaning solution is typically discharged <br /> once per week (when the anodizing line is processing material — 213 of the year) into <br /> the On-Site treatment system for pH monitoring and adjustment. The amount of <br /> discharge is 35 gal. The operator responsible records the discharge along with any <br /> additional necessary on the Anodizing Hazardous Waste Log. <br /> 3.3. System Description (Refer to plot diagram as necessary) <br /> 3.3.1. Tanks and Valves <br /> 3.3.4.1. T1 (Process Waste Water Collection Tank) — 330 gal double contained <br /> below grade HDPE tank placed within an epoxy coated open top concrete <br /> vault that provides tertiary containment. Waste water and solutions are <br /> introduced into the tank via below ground double walled polypropylene <br /> piping. Process rinse water from the etching and anodizing processes are <br />
The URL can be used to link to this page
Your browser does not support the video tag.