My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
** This is a non-4200/4300/2600 Program Code, you must select a File Section
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
** This is a non-4200/4300/2600 Program Code, you must select a File Section
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2026 1:25:01 PM
Creation date
5/12/2026 9:56:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
RECORD_ID
PR0504201
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
500 E LOUISE AVE LATHROP 95330-9739
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Initial Site Investigation Work Plan - Final <br /> Former SAN JOAQUIN COGENERATION <br /> 17200 Murphy Parkway, Lathrop, San Joaquin County, California <br /> (APN 198-120-05) <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> 2.0. BACKGROUND....................................................................................................1 <br /> 3.0. SCOPE OF WORK AND PROCEDURES............................................................. 1 <br /> 3.1 . PRE-FIELD WORK ACTIVITIES........................................................................2 <br /> 3.2. SOIL BORING ADVANCEMENT AND ANALYSIS ............................................2 <br /> 3.2.1. Soil Boring Advancement ............................................................................2 <br /> 3.2.2. Soil and Groundwater Sampling ..................................................................3 <br /> 3.2.3. Boring Abandonment...................................................................................4 <br /> 3.3. SAMPLE ANALYTICAL PROCEDURES ...........................................................4 <br /> 3.4. MONITORING WELL INSTALLATION...............................................................5 <br /> 3.4.1. Pilot Boring Advancement and Sampling.....................................................5 <br /> 3.4.2. Monitoring Well Completion and Elevation Survey......................................6 <br /> 3.4.3. Monitoring Well Development and Groundwater Sampling .........................6 <br /> 3.5. REPORT PREPARATION.................................................................................. 7 <br /> FIGURES <br /> Figure 1 — Location Map <br /> Figure 2 — Site Plan <br /> Figure 3 — Proposed Monitoring Well Design <br /> APPENDICES <br /> Appendix A - Waste Characterization Map <br /> Appendix B - CVRWQCB Letters <br /> Appendix C - Monitoring and Sampling Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.