Laserfiche WebLink
(3) POTENTIALLY SIGNIFICANT IMPACT: FRENCH CAMP ROAD-AIRPORT WAY <br /> INTERSECTION <br /> By the year 2010,the French Camp Road-Airport Way unsignalizaed intersection <br /> will operate at an LOS 'D' during the mid-day peak hour with this project, <br /> resulting in a significant avoidable impact This future service level is unchanged <br /> as a result of the project. <br /> Findings: §. <br /> Changes or alterations have been required in, or incorporated into, the project <br /> which avoid or substantially lessen the significant environmental effect as <br /> identified in the Final EIFL <br /> Statement of Fact: <br /> The impact will be reduced by the following: <br /> The project proponent shall widen shoulders, limit minor street/driveway access, <br /> and provide left-turn lanes at major intersections; or <br /> t <br /> i <br /> Widen critical roadway segments to four travel lanes. <br /> (4) POTENTIALLY SIGNIFICANT IMPACT: TRAFFIC CONGESTION AT ENTRANCE <br /> TO FACIUTY <br /> d <br /> Existing Lovelace Road is a nual road with two 12-foot-wide lanes and minimal <br /> shoulders. During peak hours (especially during late morning hours on <br /> weekends), the volume of traffic is such that vehicles waiting to enter the facility <br /> create a stacking lane that extends onto Lovelace Road. This condition will be <br /> somewhat alleviated by the expansion project(two public entry lanes and greater <br /> stacking depth). <br /> a <br /> Traffic congestion in the project area is also increased by the turning movements <br /> for arriving and departing vehicles. <br /> Finding: <br /> Changes or'afterations have been required in, or incorporated into, the project <br /> which avoid or substantially lessen the significant environmental effect as <br /> identified in the Final BR. The mitigation measure is fisted below. <br /> i <br /> Statement of Fact <br /> l <br /> The impact will be reduced by the following: i <br /> The project proponent shall reconstruct that portion of Lovelace Road along the <br /> project frontage so that a two-way left-turn lane(center turn lane) can be added. <br /> i <br /> 'Attachment A -3 - UP-93-2 <br /> 1 <br /> j <br />