Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 5. Site Description <br /> The 7 Sites are located at the following addresses: <br /> Department of Toxic Substances Control <br /> 5.1 Site Background/History <br /> The 7 sites which are Dry Cleaning Facilities identified by DTSC as part of the works that will be conducted will be part of a <br /> preliminary investigation.A Phase I Site Investigation was conducted at each site to access potential contaminated areas. <br /> Phase II investigations will be carried out to collect soil, indoor air, ambient air, and/or sub-slab soil gas samples. <br /> 5.2 Client and/or Third-Party Operations at Site <br /> There are no third-party operations taking place in the investigation area. <br /> 5.3 Scope of Work <br /> The scope of work includes tasks to investigate 7 sites and prepare a remedial action plan for implementation of the cleanup <br /> phase for the DTSC Cleanup in Vulnerable Communities Discovery and Enforcement program.The tasks that will be performed <br /> are listed below.AECOM will conduct Phase II investigations in contingent to the findings of the Phase I for each site. <br /> The field discovery investigation will consist of the collection of soil gas, sub-slab soil gas, indoor air, and ambient air, samples <br /> to assess environmental conditions at these Sites. If site conditions warrant the collection of groundwater samples,the sampling <br /> will be conducted concurrently with the soil gas survey. <br /> Subcontractors will be selected for conducting the soil gas survey and for collecting groundwater samples.AECOM will be <br /> responsible for utility clearance and obtaining any required agency permits prior to initiating the subsurface investigation. Soil <br /> gas and groundwater samples will be analyzed by Eurofins Air Toxics Laboratory, a State-certified laboratory in Folsom, CA. <br /> A Task Hazard Assessment(THA)for each operation being performed by AECOM and each operation performed by an <br /> AECOM subcontractor working under the AECOM HASP must be included in Attachment A, while those performed by the <br /> managed subcontractors should be prepared by the subcontractor. <br /> Table 5-1: Task List <br /> AECOMTask Name Permit(s) Primary Task Performed ByRequired <br /> Driving To and From the Site ❑ Yes 0 No 0 0 ❑ <br /> Coronavirus Precautions—Field, Office&Travel THA ❑ Yes 0 No 0 0 ❑ <br /> Site visit and Phase 2 ❑ Yes 0 No 0 ❑ ❑ <br /> Utility Clearance ❑ Yes 0 No ❑ 0 ❑ <br /> Direct Push Drilling 0 Yes ❑ No ❑ 0 ❑ <br /> Soil Sampling ❑ Yes 0 No 0 ❑ ❑ <br /> Groundwater Sampling 0 Yes ❑ No 0 ❑ ❑ <br /> Soil Gas Probes Installation ❑ Yes 0 No ❑ 0 ❑ <br /> Soil Gas Sampling ❑ Yes 0 No 0 ❑ ❑ <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 36 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />