Laserfiche WebLink
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> Table 5-1: Task List <br /> Task Name Permit(s) Primary Task Performed By <br /> Required AECOM SUB I Third-Party <br /> Waste Transportation and Disposal ❑ Yes I ® No ❑ © ❑ <br /> 5.4 Key Dates <br /> ProjectApril 2, 2024 <br /> Field April 4, 2024 <br /> • April 1, 2025 <br /> 5.5 Physical and Biological Hazards <br /> Physical and biological hazards are hazards that threaten the physical safety of an individual; contact with the hazard typically <br /> results in an incident or injury.The following table summarizes the physical and biological hazards present at the site and the <br /> associated procedures that address protection and prevention of harm. <br /> ■ If a there is a potential of physical or biological hazard when performing a specific task, it must be addressed in <br /> the THA. <br /> Some tasks are considered High Potential (HiPo) Hazard Activities as identified in S3AM-209-PR1, Risk Assessment, based on <br /> the factors contributing to the severity and probability of credible outcomes resulting from ineffective mitigation of their hazards <br /> and are designated with"HH"in the table below. High potential hazard activities typically require additional documents such as <br /> a Safe Work Permit(S3AM-218-FM1), activity-specific permit, site specific plans, task/equipment-specific training, pre-use <br /> inspections, a competent person, etc. <br /> All checked procedures MUST be included in Attachment B for implementation and reference. The following hazards and their <br /> site-specific description are anticipated based on the scope of work and project site: <br /> Anticipated Activities, Situations and Physical & Biological Hazards <br /> Biological------------------- <br /> m Applicable Related Activity-Specific <br /> (Typically Required) <br /> ❑x Cold Stress S3AM-112-PR1 n/a <br /> ❑x Concrete Work HH S3AM-338-PR1 n/a <br /> ❑x Drilling, Boring&Direct Push Probing HH S3AM-321-PR1 n/a <br /> ❑x Driving S3AM-005-PR1 S3AM-005-FM1 <br /> ❑x Hand and Power Tools(drill,chainsaw, grinder, power saw, HH S3AM-305-PR1 n/a <br /> pressure washer, etc.) <br /> ❑x Hand Hazards S3AM-317-PR1 n/a <br /> ❑x Hazardous Waste Operations HH S3AM-117-PR1 n/a <br /> ❑x Heat Stress S3AM-113-PR1 S4DCS-AM-113-FM1 <br /> ❑x Heavy Equipment HH S3AM-309-PR1 S3AM-218-FM1 <br /> ❑x Highway and Road Work HH S3AM-306-PR1 Traffic Control Plan <br /> S3AM-306-FM 1 <br /> ❑x Manual Lifting S3AM-014-PR1 n/a <br /> ❑x Material Storage S3AM-316-PR1 n/a <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 37 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />