My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> • Hazard • • <br /> AECOM has adopted an approach to hazard assessment and control that incorporates both qualitative and quantitative methods <br /> to identify hazards and the degree to which they may impact employees and AECOM operations. See S3AM-209-PR1,Risk <br /> Assessment and Management,for details regarding AECOM's process. This approach is illustrated below and described in the <br /> following section. <br /> AECOM Risk Management <br /> Process Flow <br /> Organization Field <br /> Employee <br /> Planning Tools Field Tools <br /> , <br /> , <br /> , <br /> , <br /> , <br /> , <br /> Project Scope Review Project Risk Re isten Task Hazard Anahrsis Daily Tailgate Mtg. Daft Edits Use of 4-Sight <br /> Hazards and impacts are sow established,safe Project staff review The daily tailgate Field staff review Field employee <br /> assessed during the Work Plan/HASP and THAs and edit to make meeting includes the templated THA uses4-Sight to <br /> proposal support and other work plans project specific. New discussionsofsite-wide agai nst current work constantly <br /> pre-award stages of the drafted,specific tasks THAs are developed changes of condition or conditions and edit identify and <br /> Project identified,project risks based on project needs other identified hazards (may need approval assess new <br /> assessed and assessed risks of supervisor/PM) hazardsor <br /> changes of <br /> conditions <br /> AECOM has adopted an approach to hazard assessment and control that incorporates both qualitative and quantitative methods <br /> to identify hazards and the degree to which they may impact employees and AECOM operations. See S3AM-209-PR1, Risk <br /> Assessment and Management,for details regarding AECOM's process. This approach is illustrated below and described in the <br /> following section. <br /> 16.1 SH&E Procedures <br /> All AECOM SH&E procedures, in their controlled copy version, are available on the internal SH&E Policy and Procedures <br /> ecosystem page. Programmatic procedures referenced in this document(for example SH&E Training)do no need to be printed <br /> for inclusion in this HASP. The applicable field procedures checklist is in the Physical Hazards section below and procedures <br /> are included in Attachment B. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 62 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.