My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> • <br /> • Environmental Management <br /> 18.1 Scope <br /> AECOM implements policies and procedures to reduce risk of land and/or water pollution and other environmental concerns <br /> during the life of the project. The AECOM Project Manager will ensure compliance with all local, state,federal and client <br /> environmental laws and/or regulations. For additional information on Environmental Management, please review the <br /> Environmental Compliance procedure, S3AM-204-PR1. <br /> 18.2 Roles and Responsibilities <br /> All AECOM staff through the leadership of the AECOM Project Manager are responsible for reducing or eliminating <br /> environmental impacts by AECOM personnel. The site supervisor and/or the site safety officer will be immediately notified of any <br /> spills, leaks, or other impacts to the ground and/or water, or other environmental emergencies, after emergency respondents <br /> have been called, if necessary. The Project Manager will be responsible for making any further notifications as required. <br /> 18.3 Staffing and Awareness <br /> AECOM staff will receive relevant awareness training to ensure proper knowledge and training when performing activities with <br /> the potential to impact the environment, as well as the requirement of this plan for proper preparedness and response. <br /> 18.4 Pollution Prevention <br /> Pollution/impact to the environment could be caused by the following sources: <br /> ■ Air emissions ■ Solid waste <br /> ■ Wastewater ■ Hydrocarbons <br /> ■ Hazardous materials ■ Storm water and sediment/erosion <br /> AECOM will employ prevention and control measures to prevent impacts to the environment. In addition, a spill kit consisting of <br /> sorbent socks, pads, shovels, and personal protective equipment(PPE)will be maintained on site by AECOM and each <br /> subcontractor. Solid waste will be collected, segregated (recyclable, non-flammable, and flammable)and removed on a regular <br /> basis. <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 68 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.