My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Health & Safety Plan <br /> For use on all high-risk,industrial and HAZWOPER projects <br /> Department of Toxic Substances Control <br /> 19. Project Closeout <br /> Completing a project requires procedures to close out Project Contractual and Administrative activities. The closeout process <br /> ensures all documentation is finalized and any Contractual Obligations are met. The Project is ready for close-out once it has <br /> been accepted by the end user organization. Project close-out is complete after all physical, regulatory, contractual, and <br /> financial close-out activities are complete. <br /> 19.1 Health and Safety File <br /> The Health and Safety File will normally include: <br /> ■ Brief description of the work carried out. <br /> ■ Residual hazards which remain and how they have been dealt with(e.g. surveys, or information on asbestos, <br /> contaminated land,water bearing strata, buried services etc.). <br /> ■ Key structural principles incorporated in the design (e.g. bracing)safe working loads etc. <br /> ■ Any hazards associated with the materials used. <br /> ■ Nature, location, and markings of significant services including underground cables, gas supplies,firefighting etc. <br /> ■ Information and 'as built' drawings including safe access to and from confined spaces etc. <br /> ■ Daily Tailgate Meeting Forms <br /> ■ Lessons Learned <br /> ©AECOM Restricted <br /> Universal Heath and Safety Plan Template(S4[DSC]AM-209-FM2-C) 69 <br /> Revision 15 October 18,2023 <br /> PRINTED COPIES ARE UNCONTROLLED.CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.