My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2026 9:32:59 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/�_COM Imagine <br /> /� Delivered, <br /> Americas <br /> Highway and Road Work S3AM-306-PR1 <br /> 1. Purpose and Scope <br /> To address potential hazards that may occur while working on public or private roadways or within the right-of-way of <br /> a public or private roadway. <br /> • This procedure applies to all AECOM Americas-based employees and operations and any other entity and its <br /> personnel contractually required to comply with this document's content. <br /> • This procedure is designed to assure that work on highway and roads meets the requirements established in <br /> federal, state, provincial, territorial, and local department of transportation laws, regulations, and guidance <br /> Qurisdictional requirements and guidance). If discrepancies exist between this procedure and other applicable <br /> materials,the most stringent option shall be selected. <br /> Procedure <br /> 2.1 Planning Work in a Highway or Road Setting <br /> 2.1.1 The Project Manager will prepare an SH&E Plan consistent with S3AM-209-PRI Risk Assessment& <br /> Management and include a thorough assessment of all hazards. Priority shall be placed on eliminating the <br /> need to place workers on an active roadway,followed by using barriers to physically separate workers from <br /> traffic. PPE and other warning devices that do not offer substantial protection from moving vehicles and <br /> equipment will be selected and used in combination with more advanced controls. <br /> 2.1.2 Traffic Control Plans and Traffic Protection Plans <br /> ■ For work that occurs in the right-of-way(area that includes the traveled way, shoulders, and clear <br /> zone)or may otherwise expose workers to the motoring public, a Traffic Control Plan shall be <br /> developed and incorporated directly into the SH&E Plan or included as a separate Plan by attachment <br /> or reference.This applies to both long and short duration activities in/or adjacent to roadways even <br /> when not required by a local jurisdiction. <br /> ■ For work within a worksite that involves the movement of vehicles or equipment, a Traffic Protection <br /> Plan shall be developed and incorporated directly into the SH&E Plan by or included as a separate <br /> Plan by attachment. <br /> ■ Pedestrian traffic will be accommodated by separating, rerouting or otherwise isolating pedestrian <br /> traffic from the work zone to eliminate issues of pedestrian right of way. In cases where this cannot be <br /> accommodated, then control measures to assure pedestrian right of way through the work zone shall <br /> be included in the Traffic Control Plan and/or Traffic Protection Plan. <br /> 2.1.3 Applicable jurisdictional requirements and guidance as well as industry standards and best practices shall <br /> be consulted during plan development and appropriate control measures established.These include the <br /> Occupational Health and Safety regulations and associated standards or guidebooks, and local <br /> jurisdictional manuals on the uniformity of traffic control devices in temporary construction, maintenance, <br /> and utility work zones(e.g., U.S. Federal Motor Carrier Safety Administration, Ontario Traffic Manual Book <br /> 7, etc.). <br /> 2.1.4 Additional risk-specific plans may be necessary for specialized work. Examples include fall protection, <br /> respiratory protection,work over water, confined spaces, hazardous materials/waste, tunneling/blasting, <br /> heat/cold stress, excavation, heavy equipment operation, aerial lifts, and hearing conservation. <br /> ©AECOM Restricted <br /> Highway and Road Work(S3AM-306-PR1) <br /> Revision 6 April 28,2020 <br /> PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. 1/8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.