Laserfiche WebLink
Cleanup in Vulnerable Communities'Initiative Discovery Project Reference:Favorite Cleaners <br /> and Enforcement Discovery Investigation Work Plan Project Number:60688620 <br /> AECOM Risk Assessor Responsible for data evaluation and development of the HHRA conducted in <br /> accordance with DTSC Human and Ecological Risk Office Note 4(DTSC 2022a) <br /> and any additional applicable risk management standards. <br /> AECOM Health and Safety Responsible for coordinating and ensuring compliance of occupational health and <br /> Manager safety standards. <br /> Laboratory Representative Responsible for receiving samples at the laboratory facility, applying appropriate <br /> analytical methodologies,following QA/QC procedures, and ensuring that the <br /> data are accurate. <br /> 1.2.2 Contact Information <br /> The list below provides the contact information for various representatives involved with this project: <br /> Role Name Telephone <br /> Number <br /> DTSC CVCI D&E Coordinator Julian Grijalva, CA PE (559)578-8174 <br /> DTSC Project Manager Stacy Mann (279)895-5016 <br /> DTSC Geologist Andrew Leavitt, PG (818)717-6507 <br /> DTSC Toxicologist Weiying Jiang, Ph.D (916)255-3665 <br /> AECOM Program Manager* Edmund Tarter, CAPE (916)216-6125 <br /> AECOM Project Manager Wanda Farmer (843)209-1534 <br /> AECOM Quality Assurance Manager Stacy Louie (916)414-5810 <br /> AECOM Risk Assessor Catherine Schwach (415)816-2778 <br /> AECOM Health and Safety Manager Shannon Couch (510)277-5369 <br /> Laboratory Representative Monica Tran (916)605-3408 <br /> Laboratory Quality Assurance Officer Christopher Davis (650)219-6399 <br /> *The work performed pursuant to this CVCI D&E Discovery Investigation Work Plan will be under the <br /> direction and supervision of the consultant's program manager who is a qualified California-registered <br /> Professional Engineer(PE)and/or Professional Geologist(PG)in compliance with the requirements of the <br /> Professional Engineers Act, Business and Professions Code Sections 6700-6899 and 7838, and the <br /> Geologist and Geophysicists Act, Business and Professions Code Sections 7800-7887. <br /> 1.3 Work Plan Organization <br /> This Work Plan is organized as follows. <br /> • Section 1 presents an introduction and the overall objectives of the Discovery Investigation process. <br /> • Section 2 presents a discussion of the Subject Property background research conducted in the preparation of <br /> the Work Plan. <br /> • The Sampling and Analysis Plan, included as Section 3, presents a discussion of planned field data collection <br /> activities and laboratory analytical techniques that will be used to evaluate environmental conditions at the <br /> Subject Property. <br /> • The QAPP, presented in Section 4, describes the QA/QC measures to be used during project execution to <br /> provide an appropriate level of assurance that the data collected during the CVCI Discovery Investigation meet <br /> the project DQOs to support risk-based decisions regarding the Subject Property acceptability. <br /> • The procedure for dealing with potential field variances is described in Section 5. <br /> • Field health and safety procedures are discussed in Section 6. <br /> • The planned screening risk evaluations are described in Section 7. <br /> Prepared for: California Department of Toxic Substances Control AECOM <br /> 3 <br />