My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501523
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
622
>
2900 - Site Mitigation Program
>
SR2501523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2026 11:50:38 AM
Creation date
6/17/2026 9:25:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501523
PE
2900 - Site Mitigation Program
STREET_NUMBER
622
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16715050
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
622 E CHARTER WAY STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
936
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A4OM <br /> • Clean out the dust using a shop vacuum. Note: Do not use a shop vacuum to clean out the dust from drilling if the <br /> hole extends all the way through the sub-slab. <br /> • Continue drilling down using a 5/16"diameter concrete bit to below the slab. <br /> • Use the drill bit to measure the thickness of the slab and record the value. <br /> Note: If the slab is very thick(e.g., 18"),the 5/16"drill bit may not be long enough to reach the bottom of the slab. In this <br /> case, use a larger, longer drill bit for the entire length of the slab. <br /> • Hand auger to 5 feet below slab to install vapor probe. <br /> Vapor Pin® Installation: <br /> Drill down into the slab approximately 1 to 2 inches using a rotary hammer drill with a 1'/2-inch diameter drill bit. <br /> • Clean out the dust using a shop vacuum. Note: Do not use a shop vacuum to clean out the dust from drilling if the <br /> hole extends all the way through the sub-slab. <br /> • Continue drilling down using a 5/8"diameter concrete bit to below the slab. <br /> • Use the drill bit to measure the thickness of the slab and record the value. <br /> • Assemble the Vapor Pin® sampling device and Vapor Pin® sleeve. <br /> • Place the lower end of the Vapor Pin sampling device assembly into the drilled hole. Place the small hole located in <br /> the handle of the Installation/Extraction tool, over the Vapor Pin®to protect the barb fitting and tap the Vapor Pin® <br /> into place using a dead blow hammer. Make sure the Installation/Extraction tool is aligned parallel to the Vapor <br /> Pin® to avoid damaging the barb. <br /> • During installation,the Vapor Pin® sleeve may form a slight bulge between the slab and the Vapor Pin® sampling <br /> device shoulder. <br /> • Place the Vapor Pin® cap on the Vapor Pin® to prevent vapor loss prior to sampling. <br /> • Allow 20 minutes or more for the sub-slab soil-gas conditions to re-equilibrate prior to sampling. <br /> 4.3 SEALING,MARKING,RECORDKEEPING <br /> Sub-slab monitoring probe installation use modeling clay to seal the hole until the sampling train configuration is set(Step 4 <br /> under Sampling Procedures below). <br /> Label the SSMP with indelible marker or paint pen on removable duct tape. <br /> Record all measurements in the project logbook, including: <br /> • Slab thickness; <br /> • Borehole diameter; and <br /> • Time when clay seal was installed <br />
The URL can be used to link to this page
Your browser does not support the video tag.