Laserfiche WebLink
October 11,2017 <br /> Page 3 of 5 <br /> Reference: Remediation Well Destruction Work Plan <br /> service will be hired to conduct a utility clearance of the area prior to the start of boring activities to minimize <br /> the potential that underground utilities or other subsurface structures might be encountered during the <br /> overdrilling and well box removal activities associated with the well destructions. <br /> 3.4 WELL DESTRUCTION ACTIVITIES <br /> Stantec will supervise a C-57 licensed well driller in the destruction of forty-eight(48)wells at the Site(Figure <br /> 2).The wells will be destroyed in accordance to the California Water Well Standards(Bulletins 74-81 and 74- <br /> go)and under the direct oversight and supervision of SJCEHD.The wells will be destroyed by over drilling <br /> each well bore to total depth using auger or drill stem with a diameter slightly larger than the original boring. <br /> Once the well casing and well boxes are removed the boring will be backfilled with a neat cement grout <br /> pumped in through a tremie pipe,from the bottom of the boring to just below grade.The well box, casing, <br /> and other debris will be contained and disposed of off-site.After the sealing the boreholes,the surface will be <br /> capped with appropriate materials to match existing grade. <br /> For wells where overdilling is unachievable due to structures, utilities,etc.that have been constructed after <br /> the remediation wells were installed,such that a limited access drill rig cannot safely complete the work,those <br /> affected wells will be properly destroyed by pressure grouting methods in accordance to the California Water <br /> Well Standards. <br /> 3.5 WASTE DISPOSAL <br /> Soil cuttings,well materials,and any water generated during destruction activities will temporarily be stored <br /> onsite in properly labeled California Department of Transportation(DOT)-approved 55-gallon steel drums <br /> pending characterization and disposal. Waste materials will be sampled and waste characterization <br /> completed for each receiving facility. The drums will be removed by a certified waste contractor and <br /> transported to an approved facility for treatment/disposal. <br /> Design with community in mind <br />