My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3003
>
2900 - Site Mitigation Program
>
PR0542307
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2026 3:55:29 PM
Creation date
6/22/2026 3:48:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542307
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024294
FACILITY_NAME
STOCKTON TERMINAL TECHNICAL COMMITTEE (STTC)
STREET_NUMBER
3003
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3003 NAVY DR STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 22, 2018 <br /> Page 4 of 4 <br /> Reference: Remediation Well Destruction Work Plan <br /> Limitations <br /> This work plan was prepared in accordance with the scope of work outlined in Stantec's contract and with <br /> generally accepted professional engineering and environmental consulting practices existing at the time this <br /> report was prepared and applicable to the location of the Site.It was prepared for the exclusive use of Tesoro, <br /> for the express purpose stated above. Any re-use of this report for a different purpose or by others not <br /> identified above shall be at the user's sole risk without liability to Stantec.To the extent that this report is <br /> based on information provided to Stantec by third parties,Stantec may have made efforts to verify this third- <br /> party information, but Stantec cannot guarantee the completeness or accuracy of this information. The <br /> opinions expressed and data collected are based on the conditions of the Site existing at the time of the field <br /> investigation.No other warranties,expressed or implied are made by Stantec. <br /> Should you have any questions or concerns regarding these activities,please feel free to contact Dan Schreiner <br /> at(916)472-3915• <br /> Regards, <br /> Stantec Consulting Services Inc. <br /> *0 <br /> Grace Hill <br /> Staff Specialist <br /> �S\ONAL GFO <br /> O <br /> o 0 <br /> � N <br /> a DAN SCHREINER <br /> No. 7646 <br /> Dan Schreiner,P.G. <br /> Senior Geologist F OF O `*O <br /> Tel: (916)472-3915 <br /> Fax: (916)773-8448 <br /> dan.schreiner(a-)stantec.com <br /> Attachments: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan with Proposed Well Destruction Locations <br /> Table i Well Construction Details <br /> Attachment 1 Field and Laboratory Procedures <br /> Design with community in mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.