My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3003
>
2900 - Site Mitigation Program
>
PR0542307
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2026 3:55:29 PM
Creation date
6/22/2026 3:48:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542307
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024294
FACILITY_NAME
STOCKTON TERMINAL TECHNICAL COMMITTEE (STTC)
STREET_NUMBER
3003
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3003 NAVY DR STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reference: Remediation Well Destruction Work Plan <br /> February 22,2018 <br /> Attachment 1 Field and Laboratory Procedures <br /> STANDARD PROCEDURE FOR <br /> WELL DESTRUCTION BORINGS <br /> Prior to drilling,all well locations are marked with white paint or other discernible marking and cleared for <br /> underground utilities through USA.In addition,any digging to be completed in the upper five feet around <br /> each well will be done using hand tools,or cleared with an air knife,to minimize any impacts to potentially <br /> unforeseen underground structures or utilities. <br /> Once pre-drilling efforts to identify subsurface structures are complete, pre-cleaned hollow stem augers <br /> (typically 8 inches in diameter)are advanced using a hollow stem auger drill rig for the purpose of removing <br /> the well materials. Upon completion of drilling, the augers are retracted and the borehole is filled with <br /> concrete,bentonite grout,hydrated bentonite chips or pellets as required by the regulatory agency.The well <br /> box and concrete apron are removed and the surface restored to match existing grade. In areas where the <br /> borehole penetrates asphalt or concrete,the borehole is capped with an equivalent thickness of asphalt or <br /> concrete patch to match finish grade. <br /> Soil and waste generated during the well destruction activities are temporarily stored on-site in 55-gallon, <br /> DOT approved drums pending waste profiling and proper disposal.A label is affixed to the drums indicating <br /> the contents of the drum and date the waste was generated. <br /> Related Procedures: <br /> • Standard Procedure for Equipment Decontamination <br /> ® Stantec <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.