My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3003
>
2900 - Site Mitigation Program
>
PR0542307
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2026 3:55:29 PM
Creation date
6/22/2026 3:48:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542307
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024294
FACILITY_NAME
STOCKTON TERMINAL TECHNICAL COMMITTEE (STTC)
STREET_NUMBER
3003
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3003 NAVY DR STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reference: Remediation Well Destruction Work Plan <br /> Attachment 1 Field and Laboratory Procedures <br /> February 22,2018 <br /> STANDARD PROCEDURE FOR <br /> EQUIPMENT DECONTAMINATION <br /> Equipment that could potentially contact subsurface media and compromise the integrity of the samples is <br /> carefully decontaminated prior to drilling and sampling. Drill augers and other large pieces of equipment <br /> are decontaminated using high pressure hot water spray. Samplers,groundwater pumps,liners and other <br /> equipment are decontaminated in an Alconox scrub solution, and double-rinsed in clean tap water rinse <br /> followed by a final distilled water rinse. <br /> The rinsate and other wastewater are contained in 55-gallon,DOT-approved drums,labeled(to identify <br /> the contents,generation date and project)and stored on-site pending waste profiling and disposal. <br /> Stantec <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.