My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0544282
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 11:06:17 AM
Creation date
6/23/2026 9:01:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544282
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
permits from San Joaquin County Environmental Health Department <br /> (County). The County requires regulatory approval letters for the proposed <br /> work be submitted as part of the boring permit applications. The County is <br /> currently taking three to five weeks to approve boring permit applications <br /> once received. The tentative schedule provided below assumes that written <br /> authorization from DTSC and the RWQCB of the work proposed in the <br /> attached Groundwater Data Gaps Investigation Technical Memorandum will <br /> be received within one week, the County will issue approved boring permits <br /> within four weeks of receipt of the applications, and the fieldwork will take <br /> six weeks to complete: <br /> • March 15, 2019 — Receive written authorization from DTSC and the <br /> RWQCB to conduct the work proposed in the attached Groundwater <br /> Data Gaps Site Investigation Technical Memorandum. Submit the <br /> boring permit applications to the County with DTSC and RWQCB <br /> approval letters upon receipt. <br /> • April 12, 2019 — Anticipated approval of boring permits from the <br /> County assuming four weeks for approval, and the boring permit <br /> application submittals are submitted with DTSC and RWQCB approval <br /> letters by March 15, 2019. <br /> • April 15, 2019 through May 24, 2019 — Conduct the data gaps <br /> investigation fieldwork upon receipt of approved boring permits from <br /> the County. Completion of the fieldwork by May 24, 2019 is pending <br /> weather conditions allowing for access to all of the proposed grab- <br /> groundwater sample locations. <br /> • August 22, 2019 — Submit the Groundwater Annual Monitoring Report <br /> including the data gaps investigation results within 90 days of <br /> completion of the data gaps investigation fieldwork in accordance <br /> with the RWQCB and DTSC approved 2018 Groundwater Monitoring <br /> Work Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.