My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0544282
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 11:06:17 AM
Creation date
6/23/2026 9:01:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544282
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec ° 3043 Gold Canal Drive,Suite 100 <br /> Rancho Cordova,California 95670 <br /> PH 916.637.8048 <br /> consultants www.geosynWc.com <br /> Technical Memorandum <br /> Date: 8 March 2019 <br /> To: Lance McMahan, C.E., DTSC <br /> John Murphy, P.G., RWQCB <br /> Copies to: Anju Wicke, Project Coordinator <br /> Jason Cashman, Port of Stockton <br /> From: Nicole Gotberg, P.G. <br /> Subject: Groundwater Data Gaps Site Investigation <br /> Geosyntec Consultants, Inc. (Geosyntec) prepared this memorandum on behalf of the Port of <br /> Stockton(Port)to present proposed groundwater sampling activities to address data gaps identified <br /> based on the third quarter 2018 groundwater monitoring data' and constituent of concern (COC) <br /> evaluation' at Rough and Ready Island (RRI), Port of Stockton, California (Figure 1, Figure 2). <br /> The 2018 Groundwater Monitoring Work Plan (GMWP)3 proposed grab-groundwater sampling <br /> locations based on 2015 groundwater data. This memorandum was prepared in accordance with <br /> the GMWP to present updated proposed grab-groundwater sampling locations and analysis based <br /> on the 2018 groundwater sample results and COC evaluation. Proposed sample locations are <br /> shown in Figures 3 through 7 and summarized in Tables 1 and 2. The groundwater samples will <br /> be collected in accordance with the sampling procedures and Quality Assurance Project Plan <br /> (QAPP) included in the agency-approved GMWP.4 The Port received comments on the <br /> Groundwater Data Gaps Site Investigation submitted on 14 December 2018 from the California <br /> Environmental Protection Agency, Department of Toxic Substances Control (DTSC) on 31 <br /> January 2019 and the Central Valley Regional Water Quality Control Board (RWQCB) on 7 <br /> January 2019. This memorandum has been revised based on the DTSC and RWQCB comments. <br /> A response to comments is included as Attachment 1. <br /> ' Geosyntec,2018a.Data Transmittal for Third Quarter 2018 Groundwater Monitoring Results.9 November. <br /> z Geosyntec, 2018b. Contaminants of Concern Evaluation, Rough and Ready Island, Port of Stockton, Stockton, <br /> California.7 December. <br /> 3 Geosyntec,2018c.Groundwater Sampling Work Plan,Rough and Ready Island,Port of Stockton,California. 1 June. <br /> 4 Geosyntec,2018c.Groundwater Sampling Work Plan,Rough and Ready Island,Port of Stockton,California. 1 June. <br /> 2019_0308_RRI_Revised Data Gaps Investigation Memo <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.