|
................ ..........—..........—
<br /> PORTABLE GENERATOR i ❑Follow general safety practices for Operation of Equipment/Machinery(above),and as follows:
<br /> Hazards:Electrical shock,carbon • Use in accordance with manufacturer's instructions.
<br /> 1 monoxide in exhaust,fuel-related I • Keep generator and work area dry.
<br /> fire,injury from mechanical hazards, I • Never use indoors,or near building air intake vents due to carbon monoxide hazard.
<br /> i lifting • Provide for ventilation and/or air monitoring where hazardous accumulation of exhaust emissions is possible.
<br /> • Use hearing protection in close proximity to operating generator,as needed.
<br /> • Use power cords/extension cords specified by instructions.
<br /> • Use ground-fault circuit interrupters(GFCIs)in accordance with manufacturer's instructions.
<br /> I See Section B.8.,"Electrical Hazards."
<br /> • Shut down equipment before refueling. See safe practices for flammable/combustible liquids in Section B.13.,
<br /> "Commercial Chemical Products."
<br /> Geosyntec Procedures:HS-109-Hearing Conservation,HS-111-Air Monitoring,
<br /> HS-115-Hazard Communication(for fuel),HS-121-Electrical Safety,Others as applicable
<br /> 6.6. DRILLING ® Applicable ❑ Not Applicable, Not Anticipated
<br /> EXPLANATORY NOTES,CLARIFICATIONS:
<br /> ® i DRILLING i ®Follow safe work practices,as applicable:
<br /> Hazards:Struck-by,run-over,caught i • Non-essential personnel to stay clear of drilling work zone when drill rig in operation.
<br /> between(pinch points), manual . Equipment inspected daily upon mobilization;maintained in good repair,backup alarms.
<br /> I lifting,roll over,fluid leaks,fuel ! . Leaks or defective safety equipment should be repaired before use.
<br /> hazards,suspended equipment • Establish eye contact with operator and use hand signals prior to approaching near equipment.
<br /> i
<br /> • PPE used near operating rig(eye/head/hearing/hand/foot protection,high visibility vests or equivalent).
<br /> I • Contractor inspects drill rig daily before use,verify daily that emergency stop is functional.
<br /> • • Drill rig to be equipped with operational emergency stop,equipment in good repair,machine guards in
<br /> place,whip checks on high pressure lines.
<br /> '• • Park personal/support vehicles in a location as to not obstruct travel lanes or other site operations.
<br /> j Operators/helpers maintain safe distance from moving parts;secure loose hair,loose clothing,equipment.
<br /> • Drill rigs will only be moved with masts lowered.
<br /> • Max.safe slope for rig will be followed,drill rig leveled,appropriate blocking/cribbing as needed.
<br /> • Use safety practices for refueling,fuel handling/storage/transport.
<br /> I • Spill equipment is available for fuel and hydraulic fluid leaks.
<br /> • Verify mechanical lift/rigging equipment(cables,sheaves,boom,attachments)is in proper working order.
<br /> I • Ventilate and conduct air monitoring,as appropriate,when drilling indoors.
<br /> I Geosyntec Procedure(s):HS-403-Drilling,Others as applicable
<br /> ® IMPORTANT! This work may/will j ®Follow safe work practices per Section B.9.,"Utility Related Hazards"
<br /> include close proximity to overhead f
<br /> electric utility lines.
<br /> B.7. CONSTRUCTION, HEAVY EQUIPMENT, LIFT EQUIPMENT ®Applicable ❑ Not Applicable,Not Anticipated
<br /> EXPLANATORY NOTES,CLARIFICATIONS:
<br /> ® HEAVY EQUIPMENT ®Follow general safe work practices for heavy equipment:
<br /> i Hazards:Struck-by,run-over,caught i; • Trained/qualified persons operate all heavy equipment.
<br /> between(pinch points),roll over, . Do not get into a potential crush situation below or between equipment,or in an excavation.
<br /> fluid leaks,overhead hazards • No passengers on moving/operating equipment except where passenger seat/restraint is present.
<br /> i • Equipment inspected daily upon mobilization;maintained in good repair,backup alarms.
<br /> j • Leaks or defective safety equipment should be repaired before use.
<br /> • Operators required to use seatbelts.
<br /> i • Maintain eye contact with operator and use hand signals prior to approaching near equipment.
<br /> • High visibility vests for all personnel in construction vehicle work area,on-site roadways and travel lanes.
<br /> I • Maximum safe slope for each vehicle will be followed.
<br /> f • Personnel to stay clear of,or restrict access to,swing radius and travel path of equipment.
<br /> i • Spill equipment available for fuel and hydraulic fluid leaks.
<br /> ' • Equipment locked,secured,brakes set,buckets/forks lowered,when not in use.
<br /> • Park personal/support vehicles in a location as to not obstruct travel lanes or other site operations.
<br /> • Mark temporary roadways clearly,provide berms/stop logs where needed.
<br /> i Geosyntec Procedure(s):HS-504-Heavy Equipment,HS-132-Competent Persons
<br /> ® IMPORTANTI This work may/will ®Follow safe work practices per Section B.9.,"Utility Related Hazards"
<br /> include close proximity to overhead
<br /> and/or underground utility lines.
<br /> PUBLIC AT RISK,SITE SECURITY •` ❑During site operations protect public(overhead protection,barriers,warning signs).
<br /> ❑During off hours,protect public with barriers,warning signs/lights,other measures as appropriate.
<br /> ❑Lock/secure hazardous materials and/or equipment.
<br /> Geosyntec° THA(ver.2)—UST Data Gap Investigation December 29,2018
<br /> Port of Stockton,WR2501 Page 6
<br /> consultants
<br />
|