My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0544282
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 11:06:17 AM
Creation date
6/23/2026 9:01:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544282
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> during the 2015 groundwater monitoring event greater than the EPA tapwater screening <br /> level of 6.0 µg/L will be sampled for metals by EPA Method 6020. <br /> Five wells located adjacent to surface water drainage channels will be sampled for general <br /> chemistry parameters to evaluate the surface water and groundwater interactions (Table <br /> 7). The general chemistry parameters will consist of the following: <br /> • Total alkalinity, carbonate alkalinity, and bicarbonate alkalinity by Standard <br /> Method 2320B. <br /> • Calcium, magnesium, potassium, and sodium by EPA Method 6010B. <br /> • Sulfate and chloride by EPA Method 300.0. <br /> 5.4.1 Field Methods and Procedures <br /> All field work will be performed under the supervision of a California licensed <br /> professional geologist or engineer in accordance with the Standard Operating Procedures <br /> (SOP) for low-flow sampling provided in Appendix F and the Health and Safety Plan <br /> (HASP) provided in Appendix G. Confluence Environmental of Rio Linda, California <br /> (Confluence) will perform groundwater sample collection under the direction of <br /> Geosyntec using bladder pumps and the low-flow sampling methodology outlined in <br /> Appendix F. The groundwater samples will be collected at a mid-screen depth in each <br /> well. <br /> Within each area, groundwater sampling will be conducted starting with the wells that <br /> have had the lowest VOC concentrations with progressive sampling of the wells with <br /> higher VOC concentrations. A new disposable bladder will be used at each well. Prior to <br /> and after each use, reusable sampling equipment will be properly decontaminated as <br /> described in the SOP in Appendix F.Quality assurance/quality control(QA/QC)samples <br /> will be collected in accordance with the Quality Assurance Project Plan(QAPP)provided <br /> in Appendix H. <br /> 5.4.2 Laboratory Methods and Procedures <br /> The groundwater samples will be sent under standard chain-of-custody procedures to <br /> TestAmerica Laboratories, Inc. of West Sacramento, California (TestAmerica), a <br /> California-certified laboratory, for analysis as listed in Table 7. The QAPP in Appendix <br /> H provides the reporting and method detection limits for specific analytes. <br /> RRI Groundwater Monitoring Work Plan 24 1 June 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.